FAA Advisory circularActive — selected source checked

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

27-1B · Changes 1–9 incorporated Source checked 2026-11-28

Scope, source and reading notes

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

Source page 472 · PDF page 472

✓ T:l\1-.llfVVALL

MET AL T Al:i.JI~ Fl TTI NG'

Cl'\ITIC:l';L f'LANBE AREA

A PRANGIBLE B(i;)LT

AIRf'.Ri,FT STi;:UCTlJRE

'SHIEAR PU LL OUT OF T .AN f~ SHE.A:R

AIRCRAFT Sl'E?UCTURE TANK: Fl TTI NG FLANGE f'RA'NGI 8LE !BOLT

4000 .aooo 5000 NOT MORE TH.IIJsJ 3000 = 1500

N0T u~:ss Tt1A'N ~000 = 750

BREAlf (TENSION-SHEAR)

FIGURE AC27 95t~!;, TYPICAL METHODS OF FRA'NGIBLEOR DEFOf1MAB!,...E

ATTACHMENT LOAD CALCULATIONS: EXAl'v1PLE 'l. FR,l,\f\Jt,.IBI.£ SQLTS

View figures, tables and original page layoutOriginal source page Source page 472 · PDF page 472 of AC 27-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-27

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.