AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
Failure Condition
Categories
Suggested Verification Method
Possible Additional Methods
Minor Analysis *3 Flight Testing
Major Analysis
Simulation
Ground Test
Flight Test
Analysis
Simulation
Hazardous/ Severe-Major
Catastrophic
*1, *2 Limited Flight Tests
Ground Test *1, *2 Limited Flight Tests Analysis Simulation
Ground Test
* - Notes:
1 - This should be determined on a case-to-case basis.
2 - Minimize flight testing as a verification methodology, for this combination of provided integrity and failure condition category, due to safety in testing considerations. However, desirable flight testing may be feasible for some aspects if observing proper identification of flight test risk and assessments, and risk mitigations, in accordance with FAA Order 4040.26.
3 - For analysis or verification, those probable failures evaluated as having minor effects, flight testing is an option if the effects are not obvious or if there can only be evaluation of closed loop effects in flight.
Figure AC 27 MG 17-1 Verification Methodology
(ii) Due to AdFC inherent complexity, AdFC systems that typically have a large number of test cases of single and multiple failures should be investigated to verify the safety functions under all failure conditions.
(A) Non-Real Time Computer Analysis. At the beginning of the development process, when system components are not yet available in hardware, non-real time computer simulation is a useful tool for supporting the preliminary system safety assessment. This allows, at an early stage of the development, a prediction of the effects and an assessment of the criticality of failure modes of the flight control system.
(B) Pilot-in-the-Loop Simulator Test. It may be practical to use a flight simulator (FS) to qualitatively verify safety assessments for certain AdFC failure conditions that would be high risk or unsafe to perform in flight. These assessments may be part of the SA process used to show compliance with specific regulations. For
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source