AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
guidance for obtaining installation approval for installed rechargeable lithium battery and battery systems on rotorcraft.
(B) Installation requirements for installed non-rechargeable lithium batteries have some common attributes with rechargeable lithium batteries. These batteries usually exhibit less capacity and a hazard risk proportional to the capacity, but may also supply a critical and required function.
1. Each non-rechargeable lithium battery installation should address the following ten objectives, which are critical for safe installation:
Objective 1: Maintain safe cell temperatures and pressures under all foreseeable operating conditions to prevent fire and explosion.
Objective 2: Prevent the occurrence of self-sustaining, uncontrollable increases in temperature or pressure.
Objective 3: Prevent any emission of explosive or toxic gases that may accumulate in hazardous quantities, either during normal operation or as a result of a failure.
Objective 4: Meet the flammable fluid fire protection requirements of § 27.863.
Objective 5: Prevent corrosive fluids or gases that may escape from damaging surrounding structure or adjacent systems, equipment, or electrical wiring.
Objective 6: Prevent any hazardous effect on rotorcraft structure or systems caused by the maximum amount of heat generated from any battery or individual cell failure.
Objective 7: Automatically control the discharge rate of each cell to prevent cell imbalance, back charging, overheating, and uncontrollable temperature and pressure.
Objective 8: Automatically disconnect the battery in the event of an over- temperature condition, cell failure, or battery failure.
Objective 9: Alert the flight crew if an equipment state or failure affects safe operation of the rotorcraft.
Objective 10: Have a means for the flight crew to determine the battery charge state (for required battery systems).
Note: A battery system consists of the battery and any protective, monitoring, and alerting circuitry or hardware inside or outside of the battery. It also includes vents (where necessary) and packaging.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source