Design, installation, operation, and maintenance of rechargeable lithium batteries and battery systems under applicable airworthiness requirements.
Aerospace Consulting reference note: Testing and installation guidance for rechargeable lithium battery systems on aircraft; revision A supersedes AC 20-184.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f2402c97abdd38bf5569f097e8f24be48e024dbf4210e6fa551ada910dcc66a7
09/18/2026
Appendix G
very small button/coin rechargeable lithium battery installations with less than 2 watt- hours of energy.
G.5 ICA Required by § 23.1529, Appendix A to Part 23. Include the following in the ICA, to comply with § 23.1529, a ppendix A to Part 23:
G.5.1 Maintenance requirements to replace each rechargeable lithium battery within an interval o r monitoring based on state of health that will ensure there is sufficient charge to power equipment.
G.5.2 A requirement to only replace rechargeable lithium batteries with batteries from the same manufacturer with the same part number or to obtain a new FAA approval for installing a different battery. Refer to the battery Original Equipment Manufacturer maintenance manual.
G.5.3 Procedures to ensure that each rechargeable lithium battery has not:
• Experienced degraded charge retention ability or other damage during storage.
• Been damaged from environmental or physical impacts such as mechanical shock,
vibration, heat, and possible abuses encountered during storage, transportation prior to their installation or maintenance activities on or around them.
G.5.4 Precautions to prevent mishandling of replacement rechargeable lithium batteries prior to their installation that could result in short-circuit or other unintentional damage.
G.6 Uncontained Engine or APU Rotor Failures: §§ 23.2410 and 23.2510 at Amendment 23-64.
G.6.1 In general, as part of showing compliance with §§ 23.2410 a nd 23.2510, the FAA expects the applicant to demonstrate that a foreseeable event o riginating from outside of a rechargeable lithium battery, such as an uncontained rotor burst, will not compromise continued safe flight and l anding. You may use fail-safe design features that encase and safely vent the hazardous byproducts of a failure originated from within the battery to show compliance with the rechargeable lithium battery SOs. Depending on the location of the battery installation, a rotor failure could defeat such safety features. If a rechargeable lithium battery is installed in a rotor burst zone, ensure the means of compliance with the SOs remains effective considering potential rotor failures that could damage the battery.
G.6.2 Regarding compliance with § 23.2410 for turbine engine rotor failures, AC 20-128A provides guidance on fragmentation characteristics and the boundaries of the locations in which applicants are expected to evaluate the effects of impact damage following an uncontained rotor burst. For a rechargeable lithium battery—except for very small button/coin cells with less than 2 watt-hours of energy that meet UL 1642, U L 2054, or IEC 62133—assess the r otor-burst-induced damage to the battery in a plan for showing
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-184A and 25-887-SC — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source