FAA Advisory circularActive

AC 20-184A

Guidance on Testing and Installation of Rechargeable Lithium Battery and Battery Systems on Aircraft

20-184A Source checked 2026-11-28

Scope, source and reading notes

Design, installation, operation, and maintenance of rechargeable lithium batteries and battery systems under applicable airworthiness requirements.

Aerospace Consulting reference note: Testing and installation guidance for rechargeable lithium battery systems on aircraft; revision A supersedes AC 20-184.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f2402c97abdd38bf5569f097e8f24be48e024dbf4210e6fa551ada910dcc66a7

Source page 13 · PDF page 13

09/18/2026

AC 20-184A

2.4.1.2 If the FAA requires ground and/or flight tests, pe r the compliance checklist in the certification plan, then the applicant should perform the tests to demonstrate the lithium battery systems and the systems in which they are installed will not have any adverse effect on the aircraft.

2.4.1.3 If the FAA requires Electromagnetic Interference/Radio Frequency Interference (EMI/RFI) test, pe r the compliance checklist in the certification plan, then the applicant should perform the electromagnetic compatibility test described in AC 20-190, Aircraft Electromagnetic Compatibility Certification, to determine that the installation of the lithium battery does not have any adverse effect on aircraft systems and that the aircraft systems do not have any adverse effect on the lithium battery. This will demonstrate that the battery system functions as designed during normal aircraft operations.

2.5 System Safety Assessment. The safety assessment of the lithium battery installation should address the battery system, the aircraft interface, and the aircraft functional loads to which the battery system provides power.

2.5.1 Perform a system safety assessment to show compliance with §§ 25.1309, 27.1309, 29.1309 a nd 23.2510 a nd all applicable SCs with respect to lithium batteries. This assessment should address concerns associated with the installation of the lithium batteries and battery systems, the possibility of direct (or indirect) injury to a person, any adverse effect on crew function, or any adverse effect on other equipment and systems. These effects could be a result of normal operation or a failure in the lithium batteries. Y our safety system assessment should consider, but not be limited to, the following:

• The levels of hazard associated with installation and use of lithium batteries.

• Whether design assurance level of lithium batteries is appropriate for performance

and safety requirements based on location and intended function.

• No interference due to any failures of the lithium batteries.

• System separation and zonal analysis.

• Impact on flightcrew for normal and non-normal operation.

• Impact of emergency procedure during egress.

• Protection against fire, smoke, and electrical shock hazards.

• Other safety analysis appropriate to the system being installed.

• Statement of compliance for each requirement (SCs or SOs, as appropriate).

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

25-887-SC

Related technical context

Engineering context
Evidence and scope

AC 20-184A and 25-887-SC — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.