Design, installation, operation, and maintenance of rechargeable lithium batteries and battery systems under applicable airworthiness requirements.

Aerospace Consulting reference note: Testing and installation guidance for rechargeable lithium battery systems on aircraft; revision A supersedes AC 20-184.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f2402c97abdd38bf5569f097e8f24be48e024dbf4210e6fa551ada910dcc66a7

Source page 34 · PDF page 34

09/18/2026

Appendix D

a proposed method of compliance with the FAA. Alternatively, locate the battery outside of the rotor burst zone.

D.5 Hazard Mitigations for Large Battery System Thermal Runaway Conditions. Airplanes requiring high-capacity batteries may increase the severity level and adverse effects resulting from a battery thermal runaway condition, or any other hazards. As stated earlier, using RTCA DO-311A, including articles approved under TSO-C179b, is an accepted approach for addressing the thermal runaway aspects of rechargeable lithium battery installations. All applicable airworthiness regulations must be addressed and complied with. RTCA DO-311A and TSO-C179b provide a testing standard and article-level approval that requires additional integration and mitigation strategies in order to fully comply with the applicable airworthiness regulations on the aircraft. The FAA outlines the following guidance in Section D.5.1 to address verification aspects of lithium battery thermal runaway conditions for RTCA DO-311A, section 2.4.5.5. All other tests within RTCA DO-311A are applicable as stated in the industry consensus standard.

Note: Due to the significance of technical and regulatory issues regarding Hazard Mitigations for Large Battery System Thermal Runaway Conditions (D.5), coordination with the FAA is required.

D.5.1 Battery Thermal Runaway Containment Test (RTCA DO-311A, Section 2.4.5.5). Coordinate as soon as possible with the FAA on the proposed design methodology.

D.5.1.1 RTCA DO-311A, section 2.4.5.5 describes the test methods for battery thermal runaway containment that are designed to force the entire battery into a thermal runaway state. This may not be feasible for very large high- capacity systems. To address the feasibility of very large high-capacity battery system testing, this section of the AC defines a module or sub-pack as a battery system divided into smaller configurations to help in testing and validating the safety implication of the battery system. The battery and battery system can be designed into several smaller modules or sub-packs. Each module has an assembly of cells electrically connected and enclosed in a single enclosure. Each sub-pack has an assembly of electrically connected modules that is enclosed by a single enclosure. The venting design of the sub-pack, module, and cells needs to be considered in the mitigation strategy.

D.5.1.2 To successfully comply with the requirement of RTCA DO-311A, section 2.4.5.5 test, it is acceptable to use a modularized/sub-pack battery system design.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

25-887-SC

Related technical context

Engineering context
Evidence and scope

AC 20-184A and 25-887-SC — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.