FAA Advisory circularActive

AC 20-184A

Guidance on Testing and Installation of Rechargeable Lithium Battery and Battery Systems on Aircraft

20-184A Source checked 2026-11-28

Scope, source and reading notes

Design, installation, operation, and maintenance of rechargeable lithium batteries and battery systems under applicable airworthiness requirements.

Aerospace Consulting reference note: Testing and installation guidance for rechargeable lithium battery systems on aircraft; revision A supersedes AC 20-184.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f2402c97abdd38bf5569f097e8f24be48e024dbf4210e6fa551ada910dcc66a7

Source page 40 · PDF page 40

09/18/2026

Appendix F

subsection in section 2.2 references a specific test procedure found in section 2.4. Test procedures and evaluation criteria specifically for cells, batteries, and end items are outlined in section 2.4 corresponding to each of the functional and safety requirements. Test conditions are defined in section 2.3. Consider each of these requirements and guidelines when designing cells and batteries.

F.5.2 Sections 27.1353(a) and 29.1353(a) are intended to ensure that the cells and batteries are designed to eliminate the potential for uncontrollable failures. However, a certain number of failures will still occur due to various factors, many of which are beyond the control of the designer. Therefore, these regulations, as a whole, are intended to protect the rotorcraft and its occupants even if a failure occurs.

F.5.3 These regulations are independent of each other. Demonstrating compliance with one of these regulations does not constitute compliance with the other regulations. An acceptable method of compliance for each regulation is as follows:

F.5.4 Method of Compliance for §§ 27.1353(a) and 29.1353(a).

F.5.4.1 Sections 27.1353(a) and 29.1353(a) require that the cell and battery be designed to prevent propagation of a thermal event, such as self-sustained, uncontrollable increases in temperature or pressure from one cell to adjacent cells.

F.5.4.2 Show that the batteries meet the requirements in RTCA DO-311A, sections 2.2, Equipment Requirements – St andard Conditions (which are applicable according to RTCA DO-311A, section 2.4.2) and 2.3 Equipment Requirements – E nvironmental Conditions. Consider that batteries with less than 2 watt-hours of energy that are not button/coin batteries, or do not meet UL 1642, UL 2054, or IEC 62133, to be energy category 2 batteries. Use the test procedures in RTCA DO-311A, section 2.4, Equipment Test Procedures, to show that the requirements of RTCA DO-311A, section 2.2 are met. Note that RTCA DO-311A, table 2-2 provides a test matrix that defines which tests are required for each category of battery, along with the order of the testing.

F.5.4.3 Provide the FAA with the video of the testing conducted for RTCA DO- 311A section 2.4.5.5.

F.5.5 Method of Compliance for §§ 27.1353(b) and 29.1353(b).

F.5.5.1 An acceptable means of complying with §§ 27.1353(b) and 29.1353(b) includes using any tests used to demonstrate compliance with unde r §§ 27.1352(a) and 29.1353(a) to demonstrate that all emitted gases are contained or vented overboard (i.e., vented outside the rotorcraft) through designed ports. If the design has ports to vent gases overboard, show that there are means to protect ground personnel from exposure to these gases and to prevent re-ingestion, for example through engine in-take or air

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

25-887-SC

Related technical context

Engineering context
Evidence and scope

AC 20-184A and 25-887-SC — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.