Design, installation, operation, and maintenance of rechargeable lithium batteries and battery systems under applicable airworthiness requirements.
Aerospace Consulting reference note: Testing and installation guidance for rechargeable lithium battery systems on aircraft; revision A supersedes AC 20-184.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f2402c97abdd38bf5569f097e8f24be48e024dbf4210e6fa551ada910dcc66a7
09/18/2026
AC 20-184A Appendix F
lithium battery thermal/pressure runaway conditions are not extremely improbable. Assume such failures could occur sometime during the life of the battery installation when demonstrating compliance with §§ 27.1309 and 29.1309. Application of §§ 27.1309 and 29.1309 may result in required periodic maintenance actions or flightcrew alerting features. For example, an over-temperature warning system may be necessary to allow the flightcrew to manage potentially unsafe system operating conditions. Provide rationale for alerting requirements (or for why an alert is not needed) in the system safety assessment of the battery installations to demonstrate compliance with §§ 27.1309 and 29.1309. Such alerts, if provided, must meet §§ 27.1322 and 29.1322.
F.5.10.2 The ICA should include the following provisions to comply with §§ 27.1529 a nd 29.1529:
1. Maintenance requirements to replace each rechargeable lithium battery
within an interval or monitoring based on state of health that will ensure there is sufficient charge to power equipment.
2. A requirement to only replace rechargeable lithium batteries with
batteries from the same manufacturer with the same part number or to obtain a new FAA approval for installing a different battery. Refer to the battery Original Equipment Manufacturer’s maintenance manual.
3. Procedures to ensure that each rechargeable lithium battery has not:
(a) Experienced degraded charge retention ability or other damage
during storage.
(b) Been damaged from environmental or physical impacts such as mechanical shock, vibration, heat, and possible abuses encountered during storage, transportation prior to their installation or maintenance activities on or around them.
4. Precautions to prevent mishandling of replacement rechargeable lithium batteries prior to their installation which could result in short- circuit or other unintentional damage.
Note: Acceptable procedures for paragraph F.5.10.2(3) above may include a quality control process for packaging, storing, maintaining, and transporting rechargeable lithium batteries, including reporting of dropped or damaged batteries.
F.5.10.3 Uncontained Engine or APU Rotor Failures: § 29.1309. As part of showing compliance with § 29.1309, the FAA expects the applicant to demonstrate that a foreseeable event originating from outside of a rechargeable lithium battery, such as an uncontained rotor burst, will not compromise continued safe flight and landing. While you may use failsafe design features that encase and safely vent the hazardous by products of a failure originated from within the battery to show
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-184A and 25-887-SC — published scope