Scope, source and reading notes
Design, installation, operation, and maintenance of rechargeable lithium batteries and battery systems under applicable airworthiness requirements.
Aerospace Consulting reference note: Testing and installation guidance for rechargeable lithium battery systems on aircraft; revision A supersedes AC 20-184.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f2402c97abdd38bf5569f097e8f24be48e024dbf4210e6fa551ada910dcc66a7
09/18/2026
Appendix D
1. Experienced degraded charge retention ability or other damage during storage.
2. Been damaged from environmental or physical impacts such as mechanical shock, vibration, heat, a nd possible abuses encountered during storage, transportation prior to their installation, or maintenance activities on or around them.
D.4.3.3 Precautions to prevent mishandling of replacement rechargeable lithium batteries prior to their installation, which could result in short-circuit or other unintentional damage.
Note: Acceptable procedures for paragraph D.4.3.2 item 2 m ay include a quality control process for packaging, storing, maintaining, and transporting rechargeable lithium batteries, including directions to report dropped or damaged batteries.
D.4.4 Section 25.1729 ICA; Electrical Wiring Interconnection Systems (EWIS). EWIS maintenance and inspection tasks required by § 25.1729 a re to ensure that EWIS components associated with rechargeable lithium batteries are sufficient to prevent degradation of any EWIS component that is designed and installed to support compliance with these SCs.
D.4.5 Sections 25.903(d) and 25.1309 Uncontained Engine or APU Rotor Failures.
D.4.5.1 As part of showing compliance with § 25.1309, t he FAA expects the applicant to demonstrate that a foreseeable event originating from outside of a rechargeable lithium battery, such as an uncontained rotor burst, will not impact the airworthiness of the aircraft preventing continued safe flight and landing. An applicant may propose fail-safe design features that encase and safely vent the hazardous byproducts of a failure originated from within the battery to show compliance with the rechargeable lithium battery SC. However, a rotor failure could defeat such safety features depending on the location of the battery installation. If an applicant proposes to install a rechargeable lithium battery in a rotor burst zone, the applicant must ensure the means of compliance with the SC remain effective considering potential rotor failures that could damage the battery.
D.4.5.2 Regarding compliance with § 25.903( d)(1) turbine engine rotor failures, AC 20-128A, Design Considerations for Minimizing Hazards caused by Uncontained Turbine Engine and Auxiliary Power Unit Rotor Failure, provides guidance on fragmentation characteristics and the boundaries of the locations in which applicants are expected to evaluate the effects of impact damage following an uncontained rotor burst. If an applicant proposes to install a rechargeable lithium battery in a rotor burst zone, the applicant must assess the rotor-burst-induced damage to the battery to show compliance with § 25.903(d)(1) in conjunction with showing compliance with the rechargeable lithium battery SC. In this case, provide
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-184A and 25-887-SC — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source