AC 20-184A
Guidance on Testing and Installation of Rechargeable Lithium Battery and Battery Systems on Aircraft
20-184A Source checked 2026-11-28
Scope, source and reading notes
Design, installation, operation, and maintenance of rechargeable lithium batteries and battery systems under applicable airworthiness requirements.
Aerospace Consulting reference note: Testing and installation guidance for rechargeable lithium battery systems on aircraft; revision A supersedes AC 20-184.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f2402c97abdd38bf5569f097e8f24be48e024dbf4210e6fa551ada910dcc66a7
09/18/2026
Appendix A
APPENDIX A. RELATED REGULATORY AND ADVISORY MATERIAL
The following regulatory and advisory materials are related to this AC:
A.1 Regulations. The following 14 CFR regulations are related to this AC. You can download the full text of these regulations from the Federal Register website at www.ecfr.gov.
• Part 21, Certification Procedures for Products and Articles.
• Part 23, Airworthiness Standards: Normal Category Airplanes.
• Part 25, Airworthiness Standards: Transport Category Airplanes.
• Part 27, Airworthiness Standards: Normal Category Rotorcraft.
• Part 29, Airworthiness Standards: Transport Category Rotorcraft.
• Part 43, Maintenance, Preventive Maintenance, Rebuilding, and Alteration.
• Part 145, Repair Station.
A.2 Advisory Circulars. The following ACs are related to the guidance in this AC. The latest version of each AC referenced in this document is available on the FAA website at FAA Advisory Circulars and on the Dynamic Regulatory System.
• AC 20-115D, Airborne Software Development Assurance Using EUROCAE ED- 12() and RTCA DO-178(), dated July 21, 2017.
• AC 20-128A, Design Considerations for Minimizing Hazards caused by
Uncontained Turbine Engine and Auxiliary Power Unit Rotor Failure, dated March 25, 1997.
• AC 20-135A, Powerplant Installation and Propulsion System Component Fire
Protection Test Methods, Standards, and Criteria, dated September 29, 2025.
• AC 20-136B, Aircraft Electrical and Electronic System Lightning Protection, dated September 7, 2011.
• AC 20-152A, Development Assurance for Airborne E lectronic Hardware, dated October 7, 2022.
• AC 20-158B, The Certification of Aircraft Electrical and Electronic Systems for Operation in the High-intensity Radiated Fields (HIRF) Environment, dated May 20, 2024.
• AC 20-190, Aircraft Electromagnetic Compatibility Certification, dated June 1, 2018.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-184A and 25-887-SC — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source