FAA Advisory circularActive

AC 20-184A

Guidance on Testing and Installation of Rechargeable Lithium Battery and Battery Systems on Aircraft

20-184A Source checked 2026-11-28

Scope, source and reading notes

Design, installation, operation, and maintenance of rechargeable lithium batteries and battery systems under applicable airworthiness requirements.

Aerospace Consulting reference note: Testing and installation guidance for rechargeable lithium battery systems on aircraft; revision A supersedes AC 20-184.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: f2402c97abdd38bf5569f097e8f24be48e024dbf4210e6fa551ada910dcc66a7

Source page 23 · PDF page 23

09/18/2026

Appendix A

A.4 Handbooks. The following handbooks are available on the Federal Aviation Administration Fire Safety website at https://www.fire.tc.faa.gov/Reports/reports.asp. You should refer to the latest version for guidance.

• DOT/FAA/AR-00/12, Aircraft Materials Fire Test Handbook, dated April 2000.

• DOT/FAA/AR-04/26, Flammability Assessment of Bulk-Packed, Non-rechargeable

Lithium Primary Batteries in Transport Category Aircraft, dated June 2004.

A.5 Orders. The following orders are available on the Dynamic Regulatory System. You should refer to the latest version for guidance.

• FAA Order 8110.4C, Type Certification, dated October 20, 2023.

• FAA Order 8110.42D, Parts Manufacturer Approval Procedures, dated October 27, 2023.

• FAA Order 8110.48A, How to Establish the Certification Basis for Changed Aeronautical Products, dated July 21, 2017.

• FAA Order 8110.52B, Type Validation and Post-type Validation Procedures, dated September 29, 2017.

• FAA Order 8110.54A, Instructions for Continued Airworthiness Responsibilities, Requirements, and Contents, dated October 23, 2010.

• TSO C179b, Rechargeable Lithium Batteries and Systems, dated March 23, 2018.

A.6 Industry Documents.

A.6.1 International Electrotechnical Commission (IEC). IEC document IEC 62133, Secondary cells and batteries containing alkaline or other non-acid electrolytes – Safety requirements for portable sealed secondary cells, and for batteries made from them, for use in portable applications - Part 2: Lithium systems, dated February 7, 2017, is related to the guidance in this AC. The document is available online at https://webstore.iec.ch/en/.

A.6.2 RTCA. The following RTCA (formerly Radio Technical Commission for Aeronautics) documents are related to the guidance in this AC. Unless otherwise specified, use the latest FAA-accepted revision for guidance. If the document is revised after publication of this AC, you should verify that the FAA accepts the subsequent revision or update as an acceptable form of guidance. The documents can be ordered online at https://www.rtca.org.

• RTCA DO-160G, Environmental Conditions and Test Procedures for Airborne

Equipment, dated December 8, 2010.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

25-887-SC

Related technical context

Engineering context
Evidence and scope

AC 20-184A and 25-887-SC — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.