FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 975

PDF page 975 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 975
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

2/4/2016                                                  AC 27-1B, Chg 7



                (iv) The FAA will review the data package to verify compliance. After certification package
acceptance, the applicant should coordinate the FAA ground and flight test plan and test schedule. The
test plan and schedule should include all proposed tests to show compliance. RTCA Document DO-275,
section 4.0, and its appendices describe one acceptable method of demonstrating compliance. The
checklists found at http://www.faa.gov/aircraft/air_cert/design_approvals/rotorcraft/nvis/ also outline
another acceptable test sequence. Upon test plan acceptance, prior to commencing any certification
tests (ground or flight), a conformity inspection should be performed. Once the conformity is completed,
any changes from the conformed configuration (e.g., removing filters or changing bulbs in light sources)
may require another conformity inspection at the discretion of the certification office.

              (v) The applicant is responsible for meeting all pre-test requirements and providing the FAA
certification office with the following:

                (A) A list of test equipment the applicant will use (i.e., tri-bar charts, illumination source,
illumination measuring device, NVG test set, or NVG eye lane).

                (B) A description of the test facilities to be used (type of darkened location).

                (C) A description of the proposed flight area including cultural lighting, terrain, obstacles,
and landing areas.

                (D) Weather and illumination information including moon cycle, anticipated climatic
conditions, etc.

                (E) Any additional training necessary to operate in a NVIS environment (novel or new
technology briefing).

                 (F) The flight equipment to be used (helmets, mounts, NVGs, flashlights, etc.).

                (vi) Ground Test Procedures.

                (A) Conducting ground testing prior to flight testing will optimize the test program and
minimize flight test risks. Conduct this evaluation from all crew stations intended to be used (including the
cabin) in NVG operations. The power supply used for ground tests, with the aircraft electrical generating
system not operating, should provide power representative of flight conditions. Consider using power
representative of flight conditions with generator and battery power to assess how the lighting system
functions on low power.

                (B) Flight-testing should be commenced after satisfactory completion of ground testing.
The schedule should allow for sufficient time between ground and flight test to resolve deficiencies
discovered during ground testing. RTCA Document DO-275, section 4.4.1 and its appendices provide
one acceptable test procedure and test sequence. Alternatively, as a minimum, complete the FAA
Ground NVG-Cockpit Compatibility checklist, found at
http://www.faa.gov/aircraft/air_cert/design_approvals/rotorcraft/nvis.-
                 (vii) Flight test procedures.

                (A) Flight test should be scheduled for a low illumination (no moon) night, preferably in an
area where there is little cultural lighting. Evaluation of NVG and NVIS lighting integration should be
conducted in low ambient light conditions, because high ambient lighting conditions may mask the effects
of inadequate cockpit lighting and reflections or glare.

                (B) Prior to commencing the flight test evaluation, a daylight familiarization flight of the
flight test area should be performed. Any specific flight regimes, maneuvers, terrain, or landing areas that



                                                                    Page MG 16-11

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →