FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 961

PDF page 961 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 961
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

2/12/03                                       AC 27-1B, Chg 1


         (4) Controlled Introduction to Service.

                  (i)   For some credit applications, full validation and implementation may
be possible during the development period. However, for many HUMS techniques, a
plan for a controlled introduction to service may be necessary to fully validate the credit.

                   (ii)   There must be provisions in the certification process to instruct the
continued airworthiness effort to ensure compliance with the aforementioned plan.

                    (iii)   During the implementation of this plan, data is accumulated by
operational aircraft, and from this data, refinements and adjustments to the original
criteria can be made. This period may also allow a proposed credit to be operated in
parallel with alternative or standard procedures when it is necessary to gain additional
in-service validation by way of back-to-back comparison

               (iv)  The plan should include procedures and provisions for this controlled
period and should include clear goals by which progress and ultimately termination of
this phase can be measured. The plan may include a multi-credit HUMS that will
require a phased introduction of credits.

         (5) Continued Airworthiness and Synthesis of Credit. Normal and established
procedures will prevail for HUMS as for all other continued airworthiness matters.
Arrangements should be made to validate the performance of an approved credit
throughout its service use. Provisions should be made to allow for the synthesis of the
service experience with relevant engineering evidence from rejected components,
development testing, seeded testing, etc. Any necessary or desired modifications to the
HUMS application or the component/equipment being monitored must be re-evaluated.

     h.  Instructions for Continued Airworthiness (ICA) and Other Requirements for
Health and Usage Monitoring System (HUMS). This section addresses the ICA,
operator's HUMS program, HUMS training, and Master Minimum Equipment List
(MMEL) revision to incorporate HUMS.

         (1) Instructions for Continued Airworthiness. The applicant for HUMS is
required to provide ICA developed in accordance with FAR/JAR Part 27 and Appendix
A. This section provides supplemental guidance with addressing aspects unique to
HUMS. The applicant may be an airframe manufacturer, HUMS equipment
manufacturer, or an operator. The ICA should address HUMS integration with the
aircraft. This section addresses both airborne and ground based systems and
equipment.

                  (i)  HUMS ICA Items. The applicant must address the following subjects
in addition to FAR/JAR Part 27. These subjects should address both airborne and
ground based systems and equipment unless specifically indicated otherwise.



                                                      Page MG 15 - 15

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →