Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B, Chg 1 2/12/03
of any movements of the flex hoses and other components under pressure, which may
interfere with essential helicopter components.
(6) System capacity or efficiency does not affect the review of the system from
the standpoint of safety; however, § 27/29.1301(a) requires "Each item of installed
equipment be of a kind and design appropriate to its intended function". Hence the
calculations of heat load of the cabin to be cooled in (British thermal unit) Btu's and the
cooling capacity of the air conditioner system may be required. The vapor cycle is a
closed system (recirculating of existing air) with no fresh air make up capability.
g. Powerplant Considerations (for mechanically-driven air conditioning
compressors):
(1) The drive systems and the drive system component supporting structure
should be adequate both statically and in fatigue to handle any loads associated with
the air conditioning drive mechanism. Both normal operating and failure conditions
(compressor lockup) should be considered. For example, on systems which are belt
driven off the tail rotor drive, all components should be substantiated at the highest
torque, shear, and moment loads that can be imposed by the belt drive (compressor
seizure as well as compressor start), in combination with the loads associated with max
transient tail rotor drive torque.
(2) The compressor drive must not affect the normal function of the drive
system. Additional load on the gearbox or the drive pulley should not cause a gearbox
temperature increase (§ 27.1041). Exceeding the gearbox temperature limit can cause
stud loosening.
(3) The mounting of a bracket (for a compressor) or an idler pulley on the
transmission top case should not affect the structural integrity or the corrosion
protection of the transmission. If a compressor/blower is mounted to the gearbox, the
overhang moment (which is created by the weight of the compressor and its center of
gravity distance), should not exceed the mount limit. The addition of a bracket which
picks up several existing top case-to-main case attachment studs may provide an
additional path for water to enter and corrode the cases around the studs. In some
cases, the studs may not be adequate to carry the additional load, because the
thickness of the top case where each of these studs is typically individually controlled
could result in the bracket warping upon installation. This warping results in unequal
axial clamp-up at the studs, which further aggravates the stud loading and may also
lead to significant case fretting. Also, the original studs may not be of adequate length
to maintain proper thread extension through the nut after the bracket is installed.
(4) In the event of a compressor seizure, it should be substantiated that no
damage to the primary drive system or aircraft structure can occur. On belt driven
installations, no damage to the primary drive system should occur due to burning or
flailing belts. On a shaft driven compressor/blower installation, the shaft shear section
should fail before exceeding the gearbox torque limit. When the shear section fails, the
Page MG 14 - 4
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.