FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 941

PDF page 941 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 941
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

2/12/03                                        AC 27-1B, Chg 1

requirements of Subpart C (14 CFR Part 27) and the design requirements of Subpart D
(14 CFR 27). Load factors should be chosen considering the most critical of limit
maneuvering load factor (§ 27.337), gust load factor (§ 27.341), or if applicable
emergency landing conditions (§ 27.561). Load paths must be substantiated for the
distribution of static and/or dynamic load conditions. Fatigue substantiation may be
required depending on the installation (§ 27.571).

         (2) The modifications done on the structure, due to air conditioner equipment
installation, should not create any adverse qualities to the overall structural integrity of
the aircraft. Any access holes cut in the aircraft structure for routing
refrigerant/electrical line skin/stringer cutouts for intake or exhaust holes, etc., should be
substantiated for overall structural integrity.

         (3) All attachment hardware used for the air conditioner modification should be
substantiated to meet the increased structural requirements.


        f.  System and Equipment Considerations

         (1) The vapor cycle (Freon) system is properly considered to be a gaseous
system. Granted, during some portion of the cycle, the Freon is in a liquid or
liquid/vapor state; however, it is a gas under standard atmospheric conditions.
Therefore, the proper system test would be a pressure test for a gaseous (pneumatic)
system.

         (2) 14 CFR Part 27 does not call out specific testing criteria but instead relies
on § 27.1309 to address potential hazards due to pressurized gas systems. A proof
pressure test of 1.5 times the maximum normal operating pressure of the system is
appropriate to satisfy the intent of § 27.1309.

         (3) The Freon pressures vary throughout the system during operation, but the
maximum normal operating pressure of the components upstream from and including
the high-pressure side of the expansion valve can be regarded as the value limited by
the overpressure switch. The condenser and receiver-dryer are of special concern as
they are of relatively large volume and a failure could cause damage to the aircraft
structure or essential mechanical components.

         (4) The highest pressure normally experienced by the low pressure portion of
the Freon system (downstream of the expansion valve to the suction side of the
compressor) occurs when the system is shutdown; hence that pressure can be used as
the "maximum normal operating pressure" for the proof and burst tests in this portion of
the system.

         (5) The burst pressure tests can be done on a component basis or on the entire
system. The proof pressure test is best done on the entire system to allow observation



                                                       Page MG 14 - 3

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →