FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 94

PDF page 94 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 94
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B, Chg 4                                                     3/31/2014


The speed is reduced and the rotorcraft is flared to a conventional
one-engine-inoperative landing.

         (3) Power. Power should be limited to minimum specification values on the
operating engine(s). This may be accomplished by adjustment of engine topping to
minimum specification values for the range of atmospheric variables to be approved.
This is frequently done by installing an adjustable device in the throttle linkage with a
control in the cockpit so that engine topping can be accurately adjusted for varying
ambient conditions. With such a device in the control system it becomes vitally
important to check topping power prior to each test sequence.

         (4) Aircraft Loading. Aft center of gravity is usually most critical because
visibility constraints limit the degree to which the pilot can see the landing surface during
the flare.  If a weight effect is shown, a minimum of two weights should be flown at each
test altitude. One weight should be the maximum weight for prevailing conditions, and
the other should provide a sufficient spread to validate weight accountability.

         (5) All-engine-out landing.

                  (i)    Several procedures can be utilized to demonstrate compliance with
the all-engine-out landing requirement. As discussed in the explanation portion of this
paragraph, § 27.75(b) contains two separate requirements. One is the ability to
transition safely into autorotation after failure of the last operative engine. The second
aspect of this rule requires that a landing from autorotation be possible. The second
requirement is discussed below. The maneuver is entered by smoothly reducing power
at an optimum autorotation airspeed at a safe height above the landing surface.  If a
complete company test program has documented an all-engine-out landing to the GW/σ
(gross weight/density ratio) limit, verification tests may be initiated at those limiting
weight conditions.  If not, buildup testing should be initiated at light weight. This test is
ordinarily conducted at mid center of gravity. Typically, all altitudes may be approved
with two weight limit landings-one at sea level and one near maximum takeoff and
landing altitude.

                   (ii)   Demonstrated compliance with this requirement is intended to show
that an autorotative descent rate can be arrested, and forward speed at touchdown can
be controlled to a reasonable value (less than 40 KTAS is recommended) to ensure a
reasonable chance of survivability for the all engine failure condition. On multiengine
rotorcraft, rotor inertia is typically lower than for single-engine rotorcraft. RPM decays
rapidly when the last engine is made inoperative. Due to this relatively low inertia level,
considerable collective may be needed to prevent rotor overspeed conditions when the
rotorcraft is flared for landing. Also, when testing the final maximum weight points, the
pilot should anticipate a need for considerable collective pitch to control rotor overspeed
during autorotative descent, particularly at high altitude WAT limiting conditions. Some
designs incorporate features which may lead to rotorcraft damage in testing this



Page 34.2

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →