FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 891

PDF page 891 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 891
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

9/30/99                                             AC 27-1B

include this intelligence in its pass-fail judgment criteria. Systems of this type would
further be conducive to in-service ground checks by overt by-pass deactivation from low
power settings to assure satisfactory mechanical function.

         (6) Power assurance for the limited-use OEI ratings depends on a complete
understanding of the engine model’s operating characteristics. Two approaches have
been discussed, one where, with the aid of a sophisticated fuel control system, the
engine “learns” its own characteristics, and the other where the performance
extrapolation is compared with a known minimum standard. The establishment of the
standard is obviously a vital part of the procedure, which depends to a large extent on
the existence of a reliable data base. In a mature program this is relatively easy to
maintain, since it is possible to use the new production engine acceptance data to
establish engine-to-engine variation and also to test engines prior to overhaul to
determine the effects of deterioration. Thus, an up-to-date minimum or worst-engine
characteristic can be maintained and service engines would be compared with this
minimum engine.

         (7) When the engine in question is a completely new design, or a remote
derivative of an existing design, establishing the initial data base presents some
problems which must be resolved. New production engines will eventually establish
engine-to-engine variation, but initially an estimated worst variation must be assumed.
The rate of deterioration and its impact on the base standard must be accounted for
from the first engine delivered, yet it may be some time before an acceptable number of
engines can be tested after service.

         (8) A partial solution lies in the development and qualification cycle of the
engine. A typical new-design program requires several development engines, of which
more than half can be expected to be used for endurance or accelerated endurance
testing. Furthermore, by the time certification is completed and production deliveries
have commenced, these engines will normally have amassed several thousand hours of
running usually to a schedule far more rigorous than normal service. The information
gathered during these tests will provide the necessary data base for the assessment of
in-service engines, and it can be progressively enlarged, and the derived data refined,
as further production and service data are obtained.

     e. Engine Considerations. This section describes the potential causes of an
engine not delivering specification OEI power levels in spite of passing a parallel
run-line power assurance check. Possible solutions are discussed in the context of one
time use 30-second and 2-minute ratings.

         (1) Fuel Flow.

                  (i)   An engine may not achieve maximum power available or emergency
rating because insufficient fuel is supplied. This condition has a number of possible
causes:



                                                        Page MG 9 - 3

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →