4/25/06 AC 27-1B, Chg 2
certification of a composite structure is an incremental, building block process which
involves phased FAA/AUTHORITY involvement and incremental approval in each of the
various areas outlined herein. This approach will minimize the risk associated with
substantiation of the full-scale article. It is strongly recommended that a certification
team approach, involving fabrication, quality, and engineering specialists from both the
applicant and FAA/AUTHORITY, be used for composite structural substantiation.
The team should assure that permanent documentation of the building block approach
in the form of reports or other FAA/AUTHORITY-acceptable documents are included in
the certification data package. The documentation includes but is not limited to the
structural substantiation reports (both analysis and test), manufacturing processes and
quality control, and Instructions for Continued Airworthiness (maintenance, overhaul,
and repair manuals). FAA/AUTHORITY engineering approves the Airworthiness
Limitations Section of the maintenance manual. Engineering practices for many of the
areas identified below are available in MIL-HDBK-17.
(1) The first area is the fabrication requirements of § 27.605:
(i) The quality system should be developed considering the critical
engineering, manufacturing, and quality requirements along with a guidance standard
such as AC 21-26, “Quality Control for the Manufacture of Composite Materials." This
ensures that all special engineering, or manufacturing quality instructions for
composites are presented, evaluated, documented, and approved, using drawings,
process and manufacturing specifications, standards, or other equivalent means. This
should be one of the early phases of a composite structure certification program, since
this represents a major building block for sequential substantiation work. Some
important concepts of AC 21-26 are included below.
(ii) Specific allowable defect limits on, for example, fiber waviness, warp
defects, fill defects, porosity, hole edge effects, edge defects, resin content, large area
disbonds , and delaminations, etc., for a particular material system component, laminate
design, detailed part, or assembly should be jointly established by engineering,
manufacturing, and quality and the associated inspection programs for defect detection
created, validated, and approved. Each critical engineering design should consider the
variability of the manufacturing process to determine the worst-case effects (maximum
waviness, disbonds, delaminations, and other critical defects) allowed by the reliability
limitations of the approved inspection program.
(iii) If bonds or bond lines such as those typical of rotorcraft rotor blade
structure are used, special inspection methods, special fabrication methods or other
approved verification methods (e.g., engineering proof tests, reference paragraph g(5)
of this AC paragraph) should be provided to detect and limit disbonds or understrength
bonds.
(iv) Structurally critical composite construction fabrication process and
procurement specifications, for fabricating reproducible and reliable structure, must be
Page MG 8 - 9