FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page B-27

PDF page 85 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 85
AC 27-1B · B-27Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

9/30/99                                             AC 27-1B



         (3) For helicopters, if VNE at any altitude is less than the maximum gross weight
sea level standard day condition VY, the steady rate of climb must be determined at the
climb speed(s) selected by the applicant not to exceed VNE. The climb performance
must be determined from 2,000 feet below the altitude from where VNE intersects VY up
to the maximum altitude for which certification is requested. This should be done
utilizing maximum continuous power on each engine with the landing gear retracted.

     b. Procedure to Determine VY.

         (1) Sawtooth climbs may be used to determine VY.  If such a technique is used,
climbs should be flown in pairs on opposite headings 90° to the wind at the test altitude.
This procedure will minimize any windshear effects. All testing must be done in smooth
air. Windshear is usually an indication of unstable air or a temperature inversion and
must also be avoided. The climbs are flown on reciprocal headings for approximately
5 minutes or through an altitude band using maximum continuous power at a constant
airspeed. Periodic power adjustments may be necessary. Additional reciprocal
heading climbs must also be conducted at different airspeeds above and below the
airspeed at the lowest point of the power required versus airspeed curve. This
technique can be repeated at different altitudes to obtain VY throughout the altitude
range.

         (2) Level flight performance (speed power) may also be used to determine VY.
The testing should be done in smooth air. The advantage of this method is that less
time is required, and the accuracy is equivalent to the sawtooth climb method. The test
can be repeated at various altitudes to determine the VY throughout the altitude range
desired for the rotorcraft. The test at each altitude should be conducted at a constant
weight over sigma (W/σ). The test is normally started at the desired W/σ with maximum
continuous power, or at VNE, in level flight. A series of points should be taken, reducing
airspeed 10 to 15 knots between points, with the lowest speed point around 20 to
30 knots. Weight should be computed for each point and the test altitude adjusted to
maintain a constant W/σ. After the data are reduced to standard day conditions, the
minimum power required airspeed will be the VY speed.

         (3) Prior to the flight test, the rotorcraft should be ballasted to the desired gross
weight and the critical center of gravity. The airspeed should be stabilized prior to data
acquisition. Data to be recorded includes time, altitude, airspeed, ambient temperature,
engine parameters, torque(s), rotor RPM, fuel reading, aircraft heading, external
configuration, etc. Power setting, weight, and climb airspeed should be planned prior to
flight. For some turboshaft engines, temperature and/or engine speed limits may be
reached prior to a limiting torque. The test team should verify that the resulting power
utilized in these tests closely approximates the power producing capabilities of a
minimum installed specification engine.

      c. Procedure to Determine All-Engine-Operating Climb Performance.


                                                       Page B - 27

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →