Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
2/27/2014 AC 27-1B, Chg 4
(3) Filler Valve. Some designs combine this function with the build-up and
vent valve assembly as shown in figure AC 27 MG 6-2.
(4) Build-up and Vent Valve Assembly. This valve is positioned in the
“vent” position when the system is being filled with oxygen and in the “build-up” position
at other times. Some designs combine this function with the filler valve as shown in
figure AC 27 MG 6-2.
(5) Pressure Build-up Coil Assembly and Pressure Closing Valve. With
the build-up and vent valve in the “build-up” position, gas that is formed is allowed to
apply pressure to the liquid to provide adequate flow through the check valve to the
evaporating coil assembly. A connection to a pressure relief valve is also provided.
(6) Evaporating Coil Assembly. This is provided to convert the liquid
oxygen into a gaseous form. The evaporating coil assembly should be of sufficient
capacity to maintain the design flow quantity to the dispensing regulators at a
temperature within +10 and -20°F of cabin ambient temperature. MIL-D-19326G
contains a discussion of installation considerations for this unit.
(7) Vent Line. Gaseous oxygen escapes through this line. At the
conclusion of the fill operation, liquid oxygen will flow overboard in a steady stream from
this line to indicate the container is full of liquid oxygen. The vent line should be located
to drain overboard at the bottom of the rotorcraft fuselage. Flow from the overboard
vent should be directed so as not to create a hazard for personnel and not allow liquid
oxygen to come in contact with the rotorcraft. The vent lines should be insulated to
prevent frosting and sweating if they pass over equipment that will be harmed by water
dripping from the lines, or drip pans should be installed under the lines. There should
be no hydrocarbon fills or drains, forward or above, in proximity to the vent outlet.
(8) Regulator. A regulator should be installed in the supply line
downstream from the heat exchanger. The regulator should reduce the liquid oxygen
converter operating pressure to a supply pressure of 50 pounds per square inch gauge
(PSIG) to be compatible with the normal operating pressure of medical oxygen
equipment.
(9) Flow Control Valve. This valve provides a calibrated flow of gaseous
oxygen from an operating supply of 50 ± 5 PSIG. A valve whose proof pressure is
specified at 80 PSIG and has a burst pressure rating of 350 PSIG would be considered
satisfactory.
(10) Check Valve. This valve prevents gaseous oxygen in the supply
system from backing up into the liquid oxygen in the container and increasing the
vaporization rate of the liquid oxygen by exposure to the gas. This valve is normally an
integral part of the liquid oxygen converter assembly.
(11) Quantity Indicators. A quantity indicator should be installed at the
appropriate rotorcraft crew station to permit monitoring of the liquid oxygen supply. The
Page MG 6 - 9
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.