FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 802

PDF page 802 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 802
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B                                                                  9/30/99

Additionally, IFR and CAT A requirements refer back to Part 29 requirements for
systems and these systems must meet their Part 29.1309 requirements.

                   (ii)   Overcurrent faults (faults to airframe ground that are less than 5.0
Milliohms) should be applied to buses and feeders as necessary to demonstrate that the
system’s overcurrent circuit protective devices are properly coordinated and provide
adequate protection/fault isolation.

                    (iii)   Simulate an overvoltage condition on each alternator/generator to
demonstrate satisfactory operation of the overvoltage sensing network. On a
multiengine configuration, the faulty alternator/generator should be removed without
affecting operation of the remainder of the system.

               (iv)  As appropriate, the annunciation circuitry should be checked for
indication of failures such as overvoltage, tripped generators, overcurrent, open feeders,
open tie breakers, etc.

         (6) Aircraft Ground Tests.  If the above tests (reference b(1) through (4)
inclusive) are conducted on a bench setup, enough tests should be repeated on the
aircraft to validate the bench test results. The following tests should be conducted on
the aircraft:

                  (i)   Normal Battery Starts. Start all engines on the aircraft following the
normal procedure prescribed in the flight manual. Record starter volts and amperes,
time, and any other parameters deemed necessary.

                   (ii)   Ground Power Cart Starts.  If the aircraft is equipped with a plug for a
ground power cart, use the procedure described in the flight manual and start all
engines. Record starter volts and amperes, time, and any other parameters deemed
necessary.

                    (iii)  Emergency Battery Operation (if provided). The emergency battery
mode of operation should be tested to assure at least proper switching, annunciation,
and battery capacity. In some instances, an analysis of battery capacity may be
adequate.

               (iv)   Distribution System Tests. With all systems operating individually,
open and close feeder circuit breakers and system circuit breakers and assure
separation of power sources.  If the opening of the feeder protection has been
satisfactorily demonstrated on a bench test facility, it should not be necessary to repeat
that demonstration on the actual aircraft. The effect of loss of power sources should
also be demonstrated on the aircraft.

              (v)   Other Tests. Conduct other tests as necessary to demonstrate proper
operation of the specific design being evaluated.



   Page MG 2 - 4

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →