FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 795

PDF page 795 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 795
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B, Chg 7                                                       2/4/2016


                             (b) Approach segment flight path and glide path should be
recaptured and stabilized prior to the final approach fix (FAF) for the intermediate
segment and the Missed Approach Point (MAP) for the final segment.

                               (c) Vertical speed in the descent should be less than 1,000
fpm.

                             (d) Torque values should be high enough to keep from
entering autorotation.

                             (e) The pilot should have enough time to easily transition to
the visual segment

                        (B) Ability to maintain airspeed at or below the maximum
airspeed for the approach.

                       (C) Maximum allowable tail winds (many steep angle
approaches have only one inbound course).

                       (D) Effect of approach downgraded from LPV to LNAV before
and after the FAF, which may require either continuation of the approach or execution of
a missed approach.

                              (viii) Assess the pilot workload and procedures, with autopilot
coupled, on complete approaches using transition waypoints and vectors-to-final.

                        (A) For steepest glide path angle and approach airspeed for
which approval is requested.

                        (B) Assess the handling qualities with the autopilot coupled.  If a
4-axis autopilot is proposed, then evaluate the loss of each axis on approach
procedures and aircraft handling characteristics.

                       (C) Assess the transition from coupled instrument flight to
uncoupled visual flight at the Decision Altitude (DA).

                             (a) Accomplish the continuation of the approach in the visual
mode to assess the workload required to slow the aircraft at a point to make a landing.

                             (b) For rotorcraft with Category A procedures, ensure the
aircraft can slow to the appropriate speed by the designated landing decision point from
the DA.

                          (ix) If not evaluating the steep angle approaches for IFR aircraft,
then apply a limitation in the rotorcraft flight manual or rotorcraft flight manual
supplement limiting IFR coupled RNAV approach operations to a maximum glidepath


Page MG 1 -16

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →