FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 784

PDF page 784 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 784
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

2/4/2016                                      AC 27-1B, Chg 7


                (ii) Demonstrate that precipitation static is not excessive when the aircraft is
flying at cruise speed (in areas of high electrical activity, including clouds and rain if
possible). Use the minimum number of installed dischargers.

       (3) Very High Frequency Omnidirectional Range (VOR) Systems.

               (i) Reduce these flight tests if adequate studies of antenna radiation pattern
have shown the patterns to be without significant holes with the rotorcraft configurations
used in flight (i.e., landing gear retracted en route and extended for approach). Make
particular note to recognize that certain rotor RPM settings may cause modulation of the
course deviation indication (rotor modulation). VOR performance should be checked for
rotor modulation in both approach and en route operation while varying rotor RPM
throughout its normal range.

                (ii) The airborne VOR system should operate normally with warning flags out
of view at all headings of the rotorcraft (in level flight) throughout the airspace within
80 NM of the VOR facility while flying above the radio line of sight altitude to within 90 to
100 percent of the maximum altitude for which the rotorcraft is certified.

                 (iii) The indicated reciprocals accuracy determination should agree to within
2°. Conduct the tests over at least two known points on the ground to obtain data in
each quadrant. Data should correlate with the ground calibration with no absolute error
exceeding ±6°. Fluctuation of the course deviation indication should not be excessive.

              (A) Enroute Reception. Fly from a VOR facility along a radial to a range of
80 NM. The VOR warning flag should not come into view nor should the station
identification signal deteriorate. The course width should be 20° (±5° tolerance, 10°
either side at the selected radial).  If practical, perform en route segment on a doppler
VOR station to verify the compatibility of the airborne unit. There have been large
errors when incompatibility exists.

              (B) Long range reception. Perform a 360° right and a 360° left turn at a
bank angle of at least 10° at an altitude just above radio line of sight (see paragraph
b.(1)(iii)(A) above for line of sight altitude) and at a distance of 80 NM from the VOR
facility. Signal dropout should not occur as evidenced by the malfunction indicator
appearance. Dropouts that are relieved by a reduction of bank angle at the same
relative heading to the station are satisfactory. The VOR identification should be
satisfactory during the left and right turns.

             (C) Enroute station passage. Verify that the To-From indicator correctly
changes as the rotorcraft passes through the cone of confusion above a VOR facility.

       (4) Localizer Systems.




                                                        Page MG 1 -5

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →