Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B 9/30/99
(i) General. Include all descriptive information necessary to identify the
configuration and conditions for which the performance data are applicable. Such
information may include the complete model designations of rotorcraft and engines,
definition of installed rotorcraft features, and equipment that affects performance
together with the operative status thereof. This section should also include definitions
or terms used in the performance section (i.e., IAS, CAS, ISA, configuration, etc.) plus
calibration data for airspeed, altimeter, ambient air temperature, and other information
of a general nature.
(ii) Performance Procedures. The procedures, techniques, and other
conditions associated with obtainment of the flight manual performance should be
included. The procedures may be presented as a performance subsection or in
connection with a particular performance graph. In the latter case, a comprehensive
listing of the conditions associated with the particular performance may serve the
objective of “procedures” if sufficiently complete. Performance figures are based on the
minimum installed specification engine.
(iii) Wind Accountability. Wind accountability may be utilized for
determining takeoff and landing field lengths. This accountability may be up to
100 percent of the minimum wind component along the takeoff or landing path opposite
to the direction of takeoff. Wind accountability data presented in the RFM should be
labeled “UNFACTORED” (if 100 percent accountability is taken) and should be
accompanied by the following note: “Unless otherwise authorized by operating
regulations, the pilot is not authorized to credit more than 50 percent of the performance
increase resulting from the actual headwind component and must reduce performance
by 150 percent of the performance decrement resulting from the actual tail wind
component.” In some rotorcraft, it may be necessary to discount the beneficial aid to
takeoff performance for winds from zero to 10 knots. This should be done if it is evident
that the winds from zero to 10 knots have resulted in a significant degradation to the
takeoff performance due to flight through the main rotor vortex. Degradation may be
determined by determining the power required to fly, by reference to a pace vehicle, at
speeds of 10 knots or less.
(iv) The following list is illustrative of the information that may be provided
for a normal category rotorcraft.
(A) Density altitude chart for converting from pressure to density altitude.
(B) Airspeed calibration (calibrated vs. true indicated airspeed) for level
flight.
(C) Hover performance charts both in and out-of-ground effect with
instructions for their use. The out-of-ground effect hover performance chart is not
required but may be useful.
Page G - 46
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.