Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B 9/30/99
is approved by the FAA/AUTHORITY. However, the manufacturer or operator may
include other “unapproved” data in a separate and distinctively identified portion within
the same document.
The RFM is considered necessary for safe operation of the rotorcraft and care should
therefore be taken to produce a manual that is consistent with the need for
completeness and clarity of the required information. Also, since the RFM is necessary
for operation of the rotorcraft in accordance with the certificate limitations, it is
considered to be public information.
(3) The page size for the RFM will be left to the discretion of the manufacturer.
In this regard, operational compliance with § 91.31 should be considered. A cover
should be provided and should indicate the nature of the contents by means of the title,
“Rotorcraft Flight Manual.” Each page of the approved portion should bear the notation
“FAA/AUTHORITY approved,” an indication of the approval sequence of that particular
page (e.g., a date of approval, a revision number suitably supported by an amendment
log which contains the appropriate date, etc.) the rotorcraft model number as it appears
on the type data sheet, and any appropriate document identification number. Pages of
the unapproved portion of the flight manual would use the issue date in lieu of the
FAA/AUTHORITY-approved date. The material should be bound in semi-permanent
fashion so that the pages will be protected and retained in proper sequence. In
selecting the form of binding, consideration should be given to the necessity for
amendment and the ease with which amendments can be accomplished.
(4) Amendments may take the form of revisions or supplements.
(i) A revision is a change to the RFM or its supplement made by the
holder of the type certificate (TC) or supplemental type certificate (STC) involved.
(ii) A supplement is an addition to the RFM. If the rotorcraft manufacturer
(holder of the TC) adds optional equipment or specific operations (such as Category “A”
vertical operation or IFR operations), then the rotorcraft manufacturer is responsible for
preparing any necessary RFM supplement. If someone other than the rotorcraft
manufacturer applies for an STC to install equipment or modify the rotorcraft such that
an RFM supplement is necessary, then the person who applies for the STC is
responsible for the preparation of the RFM supplement.
(5) “Revision” may be incorporated by inserting new pages which embody the
amended text and, where applicable, by removing superseded pages. A vertical
amendment bar or data processing symbol should be inserted in the outer margin,
where practicable, to indicate those parts of the text that have been changed. Each
amended page should be identified in the same manner as pages of the basic manual
and, in addition, should carry the assigned revision number and the
FAA/AUTHORITY-approved revision date.
Page G - 34
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.