Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B, Chg 4 3/31/2014
AC 27.1549. § 27.1549 (Amendment 27-16) POWERPLANT MARKINGS.
See section 27.1543 of this AC.
AC 27.1549A. § 27.1549 (Amendment 27-23) POWERPLANT INSTRUMENTS.
a. Explanation. Amendment 27-23 adds the requirement of marking each OEI
limit and operating range. The limits should be clearly differentiated from other limits
and ranges marked on the instrument. Refer to AC 20-88A, Instrument Markings.
b. Procedures. The method of compliance is unchanged.
AC 27.1549B. § 27.1549 (Amendment 27-29) POWERPLANT INSTRUMENTS.
a. Explanation. Amendment 27-29 introduces the optional ratings of
30-second/2-minute OEI. Paragraph 27.1549(e) has been revised to show that the
limits for the 30-second OEI rating are not required to be marked. Use of the 30-second
OEI rating is limited to critical phases of operation after a failure or precautionary
shutdown of an engine. During this critical stage of operation the crew should not be
required to monitor engine instruments to avoid exceedances. Automatic control of the
30-second OEI limits are required by § 27.1143(e) and therefore the 30-second OEI
limits are not required to be marked.
b. Procedures. The method of compliance is unchanged except the marking of
30-second OEI limits are unnecessary.
Page G - 25.10
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.