Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
6/23/23 AC 27-1B, Chg 9
with the loss of function. Installation design features to mitigate explosive increases in
temperature or pressure may be required if energy storage system DALs are not
suitable for the inherent hazard.
(E) Fluids or gases that may escape from an energy storage system or
its installation may not damage surrounding structure or any adjacent systems,
equipment, or electrical wiring of the rotorcraft (see § 27.1353(c)). Installation design
data should include features to contain, vent, or drain these fluids or gases away from
the rotorcraft. Flight tests may be required to evaluate the effectiveness of venting or
draining throughout the normal operating envelope.
(F) Explosive or toxic gases that may be emitted by an energy storage
system must not accumulate in hazardous quantities within the rotorcraft (see
§ 27.1353(b)). Installation design data should include features to contain or vent these
gases away from the rotorcraft. Flight tests may be required to evaluate the
effectiveness of venting or draining throughout the normal operating envelope.
(G) The energy storage system and its installation must prevent any
hazardous effects on the rotorcraft structure or other installed systems caused by the
maximum amount of heat generated during normal operation or by a failure of any part
of the energy storage system or its installation (see § 27.1353(d)). Shielding, cooling, or
venting provisions may be required to ensure that temperatures do not exceed allowed
temperatures of any adjacent equipment, electrical wiring, hydraulic lines, or structure.
(H) Energy storage system temperatures and pressures must be
maintained within a safe operating range during all foreseeable charging and
discharging conditions, and during any failure of the control or monitoring functions (see
§ 27.1353(d)). Energy storage system installation design features must mitigate all
hazards associated with monitoring and control failures (see § 27.1353(e)). The
monitoring and control function implemented in hardware or software should have a
DAL commensurate with the hazard associated with the loss of function.
(I) The instructions for continued airworthiness (ICA) must include
maintenance requirements to ensure that required energy storage system maintenance
functions are performed at appropriate intervals specified for each energy storage
system component, to meet the requirements in Appendix A to Part 27. This is
necessary to ensure system performance will not degrade below specified energy levels
sufficient to power Rotorcraft systems for intended applications. Similarly, the ICA must
also include procedures for the maintenance of energy storage system components in
spares storage to prevent the replacement of components with stored components that
have experienced degraded functional capability or other damage due to prolonged
storage. Replacement energy storage system components must be of the same
manufacturer and part number as initially approved, unless additional installation
approval is obtained (see § 21.9(a)). Precautions should be included in the ICA
maintenance instructions to prevent mishandling of the energy storage system
components that could result in unintentional impact damage caused by dropping or
other destructive means that could result in personal injury or property damage.
Page F - 62.4
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.