Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
6/23/23 AC 27-1B, Chg 9
(5) Energy storage systems that have the potential to emit corrosive fluids,
explosive gasses, or toxic gasses will require a design scheme to contain, drain, or vent
these fluids or gasses, to meet the requirements of § 27.1353(c). This design scheme
must not expose structure or adjacent equipment to corrosive fluids, as required by
§ 27.1353(c), or allow explosive or toxic gasses to accumulate to hazardous levels, as
required by § 27.1353(b).
(6) Energy storage systems that are susceptible to thermal runaway should
include a sense and control capability to prevent such an event or a design to safely
contain or vent heat and pressure. Designs for energy storage systems with potential for
thermal runaway must prevent an uncontrolled cascading failure that results in a
hazardous condition, to meet the requirements of § 27.1353(d).
b. Procedures.
(1) General. Chapter 11 of AC 43.13-1B, Acceptable Methods, Techniques, and
Practices—Aircraft Inspection and Repair, includes considerable guidance regarding the
installation of electrical systems (routing, separation, typing, clamping, j-box
installations, etc.). The following areas are overlooked in many cases, and special
emphasis should be placed on them during the compliance inspection of the rotorcraft:
(i) Feeder wires from the rotorcraft’s generators and energy storage systems
should be routed separately from utilization system wiring.
(ii) Generator field wiring should be routed separately from generator output
wiring. This should begin at the generator and continue to the voltage regulator.
(2) Energy Storage System Installation.
(i) Installation approval of an energy storage system consists of two parts.
One part is the approval of the energy storage system performance specifications that
meet the rotorcraft requirements and the other part is the actual installation of the
energy storage system into the rotorcraft. The following methods of showing compliance
can be demonstrated by a combination of tests and analysis.
(ii) Approval of the energy storage system for installation is dependent on
rotorcraft requirements for the installed equipment and operations.
Page F - 62.2
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.