Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
2/12/03 AC 27-1B, Chg 1
b. Procedures.
(1) Battery General. As part of the electrical system evaluation, the battery
installation should be reviewed to ensure the battery is vented and drained. If there is
some doubt regarding the ability of the drain to satisfactorily dispose of corrosive fluids,
TIA tests should be conducted to resolve the issue. Normally this is done by expelling a
dye solution through the drain system during different phases of flight to ensure that
fluids are drained clear of the rotorcraft. Some aircraft rely on the installation of a sump
jar to dispose of corrosive fluids.
(2) Battery Installation. Installation approval of batteries consists of two parts.
One part is the approval of the battery itself to performance specifications that meet the
helicopter’s requirements and the other part is the actual installation of the battery into
the helicopter. The following methods of showing compliance can be demonstrated by
a combination of tests and analysis.
(i) Approval of the battery for installation is dependent on the helicopter’s
requirements for the installed equipment and operations.
(A) The battery’s capacity must be sufficient to supply the required
current, at a voltage level that allows proper operation of the equipment/functions
dependent on battery power. This capacity must be shown to be sufficient, at the
proper voltage levels, for all operational and environmental conditions. Helicopters
approved for IFR operations require sufficient battery power to operate a minimum set
of required equipment for a time long enough to find a suitable place to land and effect a
safe landing. The minimum time for IFR is 30 minutes. Additionally, for helicopters that
employ electrical power for starting, the battery must have sufficient capacity to provide
adequate engine starting on the ground, and also to have the capability to provide
power for the air start function, when required. The power requirement for air start
could have high-level safety considerations depending on the helicopter’s power
distribution system and the number of engines.
(B) The battery should be selected with the knowledge of the type of
charging that will be supplied to it from the helicopter. The type of charging will be a
major factor to determine the number of cells that the battery should contain. If the
battery is not adequately charged, the capacity may not be available, when required, to
meet emergency power demands. Twenty cell NI-CAD batteries have been used for
several years to prevent thermal runaway; however, aircraft bus level voltage may not
be an adequate source to properly charge a 20 cell Ni-CAD battery. The nominal
voltage of a Ni-CAD cell is 1.5 volts and if the number of battery cells is 20 then;
1.5 Volts/Cell X 20 Cells = 30 volts required to even match the nominal voltage of the
installed battery. (This is actually inadequate to charge the Ni-CAD cell as a few tenth
volts above that of the nominal voltage is required.) The maximum helicopter bus
voltage available is typically 28.5 volts, which is deficient by 1.5 volts to just meet the
nominal battery voltage. A compensating factor for this battery charging design is to
Page F - 59
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.