Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B, Chg 3 9/30/2008
is likely to occur based on past service experience. This past service experience can
include malfunction of components of previously approved rotorcraft, other aircraft, or
qualitative analysis of similar components in rotorcraft applications. Analyses should be
performed on the electrical power system emphasizing the exclusion of single point
failures and the possibility of latent failures. Test methods should be developed that
uncover latent faults. To identify latent failure causing events, consider the functions
and the results of the safety analysis, as well as any failure detection monitor that may
be incorporated. Evaluate the system using various combinations of unforeseen
internal signal patterns and states. Also, evaluate the non-monitored functions by
selecting test conditions that use every signal path and decision point between the input
and output. Refer to MG-2 for electrical system test methods. These analyses should
be extended to multiple malfunctions when:
(A) The first malfunction would not be detected during normal operation of
the system, including periodic checks established at intervals which are consistent with
the degree of hazard involved; or
(B) The first malfunction would inevitably lead to other malfunctions.
(ii) The generator drive system includes the prime movers (propulsion
engines or other) and coupling devices such as gearboxes or constant speed drives.
(iii) Where crew corrective action is necessary:
(A) Adequate warning should be provided for any malfunction or failure
requiring such corrective action;
(B) Controls should be located to permit such corrective action during any
probable flight situation;
(C) If corrective action must be taken within a specified time to continue
safe operation of the generating system, it should be demonstrated that such corrective
action can be accomplished within the specified time during any probable flight
situation; and
(D) The procedure to be followed by the crew should be detailed in the
Rotorcraft Flight Manual.
(iv) Chapter 11 of Advisory Circular 43.13-1A, “Acceptable Methods,
Techniques, and Practices; Aircraft Inspection and Repair,” includes guidance on
installation of electrical systems (routing, separation, tying, clamping, j-box installations,
etc.). Special emphasis should be placed on wire routing during the rotorcraft
compliance inspection. Control wires to the rotorcraft’s generators should be routed
separately from generator output wiring. This should begin at the generator and
continue to the voltage regulator. Additionally, wiring installation design should be
Page F – 55.1
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.