Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
6/23/23 AC 27-1B, Chg 9
20-136B, Aircraft Electrical and Electronic System Lightning Protection, dated
September 7, 2011, should be used.
(iv) Certification Plan. The following subjects are not intended to provide a
complete list of the items that should be included in the certification plan, but rather
highlight some of the areas that should receive consideration. The certification plan
should address the total protection required to allow the FADEC to continue to operate
properly when the rotorcraft experiences a worst-case lightning strike encounter.
(A) Determination of Lightning Strike Attachments. Determine the
locations on the rotorcraft where lightning strike attachment is likely to occur and the
portions of the airframe through which currents may flow between attachments. The
main and tail rotors are recognized as likely attachment points; however, consideration
should be given to all possible attachment points. The swept stroke phenomenon may
not exist for all lightning strike encounters due to the fact that the rotorcraft may be
airborne with little or no airspeed.
(B) Establish the Lightning Environment. Establish the components of the
total lightning event to be considered. These are the currents and voltages that are
described in the definition of the environment.
(C) Full-Level, Complete Vehicle Testing. In accordance with traditional
FAA policy, the demonstration that the FADEC installed in a complete type design
rotorcraft will continue to operate properly when exposed to a worst-case lightning strike
is sufficient to demonstrate compliance with § 27.1309(a). Because of the difficulties
involved in utilizing this type of an approach, it is generally not used.
(D) Analytical Processes. A description should be given in the
certification plan of the analytical process and certification tests to be utilized to
demonstrate protection effectiveness. Typically, the certification plan will include a
combination of analysis and tests. (Analytical techniques are most often utilized to
predict the levels of lightning-induced transients in interconnecting wiring.) In most
cases, successful analyses are based upon well-defined geometrical or electrical
parameters such as structural dimensions and materials resistivity. When electrical
characteristics of structural materials are not well established, development tests are
often utilized to obtain this data, which is subsequently utilized in an analysis. In more
complex structures or electrical and electronic system installations, it is sometimes
difficult or impossible to define the problem in terms that can be analyzed. In these
cases, development or verification testing is often relied upon. The purpose of the
certification plan is to show how developmental tests, analyses, and verification tests
are combined to demonstrate protection design adequacy. In certain cases, previously
verified designs can be incorporated and their adequacy confirmed by reference to
previous verifications. Such reference should also be incorporated in the certification
plan.
Page F - 30.23
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.