Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B 9/30/99
tests in accordance with § 27.965(d). Using this basis, a 14- by 14-inch properly
constructed tank would not require vibration and slosh tests.
(ii) If the tank construction is of a metal or integral design which can be
shown to be similar to previously approved tanks with acceptable service history, the
vibration and slosh tests may not be required. Similarity would entail comparing the
construction technique; i.e., similar panel size, similar sealing methods, skin and angle
thickness, loads being similar, etc.
(iii) For fuel tanks located in the sponson or stub wing, the entire sponson
or wing should be rocked and vibrated unless it can be determined that a certain portion
of the tanks is critical. In this case a fixture should be developed such that the portion of
the tank being tested is rocked about a pivot point which would produce the same
amplitudes of motion for the portion of the tank being tested, as if the whole sponson or
wing was being tested. Structure loads in conjunction with these tests have not been
required.
(iv) The amplitude of vibration specified in the regulation is double
amplitude (peak to peak). Vibration amplitudes less than one thirty-second of an inch
must be justified by instrumented tests of the tank installed in the aircraft.
(v) The vibration and slosh procedures listed in Military Specification,
MIL-T-6396, have been accepted to show compliance with § 27.965(d).
(3) After all tests have been conducted, the tanks should be leak checked using
test fluid conforming to Federal Specification TT-S-735 type III or equivalent.
AC 27.967. § 27.967 FUEL TANK INSTALLATION.
a. § 27.967(a):
(1) Explanation. This paragraph was added by Amendment 27-30 to create
parallelism of both regulatory structure and level of safety between Parts 27 and 29 by
the Crash Resistant Fuel System final rule on October 3, 1994. This paragraph sets
forth a series of detail requirements for fuel tanks intended to ensure that tank leakage
or failure is unlikely. These regulatory requirements pertain primarily to proper support
of the tank and protection against chafing.
(2) Procedures. For conventional metal tanks, the support devices, commonly
called “cradles,” should be designed with wide flanges or cap strips at the contact area
with the tank to distribute the loads in the tank material. To prevent chafing, install
nonmetallic padding, treated to eliminate absorption of fuel between the tank and the
support structure. Cork strips sealed with shellac and bonded to the support structure
have been found suitable. Fuel cell sealant material should be applied over rivet heads
and in corners. Bladder cells must be designed to fit accurately in the cell cavity in
Page E - 70
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.