FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page E-39

PDF page 457 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 457
AC 27-1B · E-39Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

2/12/03                                        AC 27-1B, Chg 1

working loads are much less than crash-induced loads. A separation load less than
300 pounds should not be used regardless of the line size. The minimum 300-pound
load is necessary to prevent ground maintenance failures. A fatigue analysis and/or
test (reference paragraph d(10)) should be performed to ensure the installation is either
a safe-life design or has a conservative, mandatory replacement time. The simplified
method of paragraph e(2)(i) of AC 27 MG-11 may normally be used because of the low
ratio of working load-to-crash-induced failure load. However, since fatigue failures have
occurred in service, all fatigue sources (especially high-cycle vibratory sources) should
be evaluated. Fracture critical materials should be avoided, and damage tolerant
materials utilized. Also, if airframe deformation due to flight loads is significant, its effect
on the couplings should be checked to ensure that static or low-cycle fatigue failures do
not occur prior to the part’s intended retirement life. Large flight load deformations are
not usually present in rotorcraft.

         (6) Section 27.952(c)(1)(ii) requires a self-sealing breakaway coupling to
separate when the minimum breakaway load (reference paragraph AC 27.952d(5) and
§ 27.952(c)(1)(i)) is met or exceeded in a survivable impact. The loading modes (each
of which produces a breakaway load) are determined by analyzing and/or testing the
surrounding structure to determine the probable impact forces and directions. The
modes usually occurring are tension, bending, shear, compression, or a combination
(figure AC 27.952-1). The coupling should be designed and tested to separate at the
lowest ultimate impact load (lowest critical mode) as long as the minimum working load
criterion of § 27.952(c)(1)(i) is also satisfied. Each breakaway coupling design should
be tested in accordance with the following (reference MIL-STD-1290) or equivalent
procedures.  It should be noted that the ratio of the ultimate failure load of the weakest
component in the fuel line and the normal service load (i.e., the peak load or approved
clipped peak load experienced during a typical flight) of that component should be as
high as possible and still meet the other load criteria of this section. Typically, this ratio
should not be less than 5.

                  (i)    Static Tests. Each breakaway coupling design should be subjected to
tension and shear loads to verify and establish the design load required for separation,
nature of separation, leakage during valve actuation, general valve functioning, and
leakage following valve actuation. The rate of load application should not be greater
than 20 inches per minute. Tests to be used where applicable are shown in
figure AC 27.952-1.

                   (ii)   Dynamic Tests. Each breakaway coupling design should be
proof-tested under dynamic loading conditions. The couplings should be tested in the
three most likely anticipated modes of separation as defined in paragraph d(5). The test
configurations should be similar to those shown in figure AC 27.952-1. The load should
be applied in less than 0.005 second, and the velocity change experienced by the
loading jig should be 36 ±3 feet per second.

         (7) Section 27.952(c)(1)(iii) requires that breakaway couplings be visually
inspectable to determine that the coupling is locked together (fuel-tight) and remains


                                                       Page E - 39

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →