Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B 9/30/99
drive system components should be in serviceable condition after the test. It is
permissible but not required that these tests be performed on the same specimen of the
rotor drive system used to show compliance with § 27.923.
(2) Procedures. Testing as prescribed by this section should be conducted on
a ground-test rotorcraft conformed to the type design suggested for the endurance test
of § 27.923. In most cases, testing to comply with § 27.927(b)(1) is accomplished as a
continuation of the test of § 27.923 using the same test vehicle. For this test, the main
rotor control (cyclic/collective) may be set to simulate vertical lift. The auxiliary rotor
control (antitorque) may be set or adjusted to react main rotor torque. Rotation speed
should be maximum normal for the test condition; i.e., all engines operating as for
takeoff. Using the collective control, obtain torque as required to meet either
§ 27.927(b)(1)(i) or (ii). This will normally be 110 percent of takeoff torque or a lower
value as limited by an approved, reliable device to simultaneously limit torque on all
engines. If individual torque limiters are provided for each engine, rigging tolerances
should be at maximum allowed mismatch for the type design. For the
one-engine-inoperative (OEI) test of § 27.927(b)(2), rotor RPM droop, if any, may be
allowed as would occur in service. Since this OEI test requires the remaining engine(s)
to produce power not usually available under normal atmospheric conditions,
supplemental power augmentation may be needed such as inlet air refrigeration,
ramming, or overfueling the engine. Alternatively, bench testing with a transmission test
rig may be appropriate providing close simulation of the drive system torsionals,
shaft/coupling, misalignment, etc., is achieved. Overtesting (excessive torque) to
compensate for inadequacies in the bench test may be negotiated with the
FAA/AUTHORITY approval office. Note that compliance with § 27.903(b) requires that
the remaining engine(s) be capable of safe, continued operations under the high power
conditions of this test. This may require the engine manufacturer to conduct special
testing or to produce suitable evidence that the stresses (and gas temperatures)
associated with these governor-induced high power excursions do not compromise the
airworthiness of the remaining engines or their capability to produce topping power
automatically during the initial moments of flight after an engine failure.
c. Section 27.927(c):
(1) Explanation. This paragraph prescribes a test which is intended to
demonstrate that in the event of a pressure failure of any pressurized lubrication system
used on the rotor drive system, no failure or malfunction will occur in the rotor drive
system that will impair the capability of the crew to execute an emergency descent and
landing. The lubrication system failure modes of interest usually are limited to failure of
external lines, fittings, valves, coolers, etc., of pressure lubricated transmissions.
(2) Procedures. Conventionally, a bench test (transmission test rig) is used to
demonstrate compliance with this rule. Since this is essentially a test of the capability of
the residual oil in the transmission to provide limited lubrication, a critical entry condition
for the test would be the critical eligible lubricant preheated to the transmission oil
temperature limit. With the transmission operating at maximum normal speed, with
Page E - 20
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.