Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
9/30/99 AC 27-1B
for rotorcraft with tail rotor and single main rotor. The collective control is normally used
to set power and is not involved in the control cycling described in § 27.923(h). During
control cycling the controls may be cycled from stop to stop, or a limited travel may be
accepted if the travel produces the maximum fore and aft, left and right, and yaw thrust
components of the rotors as measured in flight for a particular flight condition. One
method of determining the required control displacement is to measure main rotor mast
bending in level forward flight at maximum continuous power (or the power associated
with the maximum rearward flight speed to be expected) for the aft control displacement
limit. Using the same mast bending instrumentation with the rotorcraft in the ground
tie-down situation and with collective control set for maximum continuous power,
displace the cyclic fore and aft to obtain the same mast bending as measured in flight.
Similar measurements and control displacements may be used for sideward thrust
components. Yaw control displacement should consider maneuver requirements in
conjunction with sideward flight. Critical gross weight and center of gravity should be
used to establish test conditions. Vertical thrust may be used during the takeoff run and
the runs at 2 ½-minute power. OEI runs should be conducted with the cyclic set for
maximum forward thrust for the 30-minute power run and at maximum vertical thrust for
the 2 ½-minute power run. For these runs and any run that does not specify the
position for the yaw control, that control should be set to react main rotor torque.
(5) Section 27.923(e) prescribes the takeoff portion of the endurance test. This
is a 10-hour test that must be run at not less than the maximum torque and the
maximum RPM to be approved for takeoff. For this test the main and auxiliary rotor
controls should be in the normal position for vertical ascent. If the applicant elects (for a
multiengine rotorcraft) to perform the 2 ½-minute OEI power test, a series of three
2 ½-minute repetitive runs should be conducted during the course of the 10-hour test.
For these tests, main and auxiliary rotor controls should be in the position for vertical
ascent, and power settings for the operating engine should provide red line torque (or
manifold pressure) and RPM for the 2 ½-minute OEI power rating. The nonoperating
engine may be allowed to operate at idle or may be shut down.
(6) The torque and speed requirements in § 27.923(e) for the optional
2 ½-minute OEI tests should be interpreted as described above for the takeoff runs. If
the test is conducted during warm ambient conditions, excessive engine gas
temperatures may be required to achieve the torque and speed conditions required by
this part of the test. Minor adjustments in the run schedule may be allowed to take
advantage of cooler nighttime ambient temperatures. Addition of water/alcohol systems
to increase engine hot-day power may be appropriate in some instances. Liquid
nitrogen spray into engine inlets has also been used to depress inlet temperatures
sufficiently to obtain test conditions.
(7) The requirement in § 27.923(g) for declutching the engine may be difficult to
achieve if engine decelerations and rotor system decelerations rates are similar. In
some cases, the engine fuel control deceleration schedule may be adjusted to achieve
clutch disengagement; otherwise, an engine shift brake mechanism may be needed.
Page E - 15
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.