Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B, Chg 7 2/4/2016
(D) Determine the manufacturer's approved (or applicants applied for)
"limit design safety factor." Divide this factor into the true structural limit load (from (C)
above) to determine the hoist system's working (or placarded) limit load.
(E) Compare the system's derived limit load to the applied one "g" payload
multiplied by the maximum downward vertical load factor (NZWMAX) to determine the
critical payload's limit value.
(F) The critical limit payload should be equal to or less than the system's
derived limit load for the installation to be approvable.
(vi) Fatigue Substantiation Procedures
(A) Fatigue evaluation of NHEC applications. Any critical components of
the suspended system and their attachments (e.g., the cargo hook, or bolted or pinned
truss attachments), the failure of which could result in a hazard to the rotorcraft, should
include an acceptable fatigue analysis.
(B) Fatigue evaluation of HEC applications. The entire external load
system, including the PCDS, should be reviewed on a component-by-component basis
to determine which, if any, components are fatigue critical. These components should
be analyzed or tested to assure their fatigue life limits are properly determined and
placed in the limited life section of the maintenance manual.
(7) Section 27.865(b) and § 27.865(c) Procedures for Quick Release Systems.
For jettisonable RLCs of any applicable cargo type, both a primary quick-release system
(PQRS) and a back-up quick-release system (BQRS) are required. Features that
should be considered are:
(i) The PQRS, BQRS and their load release devices and subsystems (such
as electronically actuated guillotines) should be separate (i.e., physically, systematically,
and functionally redundant).
(ii) The controls for the PQRS should be installed on one of the pilot's primary
controls, or in an equivalently accessible location. The use of an "equivalent accessible
location" should be reviewed on a case-by-case basis and used only where equivalent
safety is clearly maintained.
(iii) The controls for the BQRS may be less sophisticated than that of the
PQRS. For instance, manual cable cutters are acceptable provided they are listed in
the flight manual as a required device and have a dedicated, placarded storage
location.
(iv) The PQRS should release the external load in less than 5 seconds. The
BQRS should release the external load in less than 30 seconds. This time interval
begins the moment an emergency is declared and ends when the load is released.
Page D - 124
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.