FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page D-118

PDF page 391 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 391
AC 27-1B · D-118Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B, Chg 7                                                       2/4/2016


qualification flight test of this subparagraph is intended to be accomplished primarily by
analysis or bench testing. However, at least one in-flight, limit load drop test should be
conducted for the critical load case.  If one critical load case cannot be clearly identified,
then more than one drop test might be necessary. Also, in-flight tests for the minimum
load case (i.e., typically the cable hook itself) with the load trailing both in the minimum
and maximum cable length configurations should be conducted. Any safety-of-flight
limitations should be documented and placed in the RFM or RFMS. In certain low-gross
weight, jettisonable HEC configurations, the PCDS may act as a trailing airfoil that could
result in entangling the PCDS and the rotorcraft. These configurations should be
assessed on a case-by-case basis by analysis or flight test to assure any safety-of-flight
limitations are clearly identified and placed in the RFM or RFMS (also see PCDS).

              (B) Separation characteristics of jettisonable external loads. For all
jettisonable RLC of any applicable cargo type, satisfactory post-jettison separation
characteristics of all loads should meet the minimum criteria that follow:

                  (1) Separate functioning of the PQRS and BQRS resulting in a
complete, immediate release of the external load without interference by the rotorcraft
or external load system.

                  (2) No damage to the helicopter during or following actuation of the
QRS and load jettisoning.

                  (3) A jettison trajectory clear of the helicopter.

                  (4) No inherent instability of the jettisonable (or just jettisoned) HEC or
NHEC while in proximity to the helicopter.

                  (5) No adverse or uncontrollable helicopter reactions at the time of
jettison.

                  (6) Stability and control characteristics after jettison within the originally
approved limits.

                  (7) No adverse degradation on helicopter performance characteristics
after jettison.

             (C) Jettison requirements for jettisonable external loads. For
representative cargo types (low, medium, and high density loads on long and short
lines), emergency and normal jettison procedures should be demonstrated (by a
combination of analysis, ground tests, and flight tests) at sufficient combinations of flight
conditions to establish a jettison envelope that should be placed in the flight manual.

             (D) QRS demonstration. Repetitive jettison demonstrations, which may be
accomplished during ground or flight tests, should be conducted that use the PQRS.
The BQRS should be utilized at least once.


Page D - 118

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →