AC 27-1B, Chg 4 12/1/2011
(1) The first area is the fabrication requirements of § 27.605:
(i) The quality control system should be developed considering the critical
engineering, manufacturing, and quality requirements and a guidance standard such as
AC 21-26, “Quality Control for the Manufacture of Composite Materials." This ensures
that all special engineering, or manufacturing quality instructions for composites are
presented, evaluated, documented, and approved, using drawings, process and
manufacturing specifications, standards, or other equivalent means. This should be one
of the early phases of a composite structure certification program, since this represents
a major building block for sequential substantiation work. Some important concepts of
AC 21-26 are included below.
(ii) Specific allowable defect limits (e.g., fiber waviness, warp defects, fill defects,
porosity, hole edge effects, edge defects, resin content, large area disbonds, and
delaminations) for a particular material system component, laminate design, detailed
part, or assembly should be jointly established by engineering, manufacturing, and
quality, and the associated inspection programs created, validated, and approved for
defect detection. Each critical engineering design should consider the variability of the
manufacturing process to determine the worst case effects (maximum waviness,
disbonds, delaminations, and other critical defects) allowed by the reliability limitations
of the approved inspection program.
(iii) If bonds or bond lines such as those typical of rotorcraft rotor blade structure
are used, special inspection methods, special fabrication methods, or other approved
verification methods (e.g., engineering proof tests - see paragraph f.(6)) should be
provided to detect and limit disbonds or understrength bonds.
(iv) Structurally critical composite construction fabrication process and
procurement specifications, for fabricating reproducible and reliable structure, must be
provided and FAA approved early during the certification process and should, as a
minimum, cover the following:
(A) Vendor and Qualified Parts List (QPL) Control. Applicants should be able
to demonstrate to FAA certification team members (both the manufacturing inspection
district office (MIDO) and FAA engineering) at any time, that their quality control
systems ensure on a continuous basis, that only qualified suppliers provide the basic
material constituents or material systems (e.g., pre-pregs) that meet approved material
specifications. Recommended guidelines for qualification of alternate material systems
and suppliers are contained in CMH-17. These methods can also be used periodically
for qualification status renewals of existing material systems and suppliers.
(B) Receiving Inspection and In-Process Inspection. Applicants should be able to
demonstrate to FAA certification team members (both MIDO and engineering), at any
time, that their receiving and in-process quality control systems provide products, which
continuously meet approved material and process specifications. Quality systems
Page C - 96