FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page C-20

PDF page 170 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 170
AC 27-1B · C-20Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B                                                                  9/30/99

              (v)  The analysis must include appropriate special factors, casting factors,
bearing factors, and fitting factors prescribed by §§ 27.619, 27.621, 27.623, and 27.625,
respectively. The fitting factor of 1.15 must be applied in the analysis of the tail rotor
installation.

AC 27.401A.    § 27.401 (Amendment 27-27) AUXILIARY ROTOR ASSEMBLIES.

     a. Explanation. Amendment 27-27 removed this section since the requirements
are adequately addressed in §§ 27.337, 27.339, and 27.341.

     b. Procedures. The policy material pertaining to this section is retained as
supplemental information.

AC 27.403.  § 27.403 AUXILIARY ROTOR ATTACHMENT STRUCTURE.

     a. Explanation.

         (1) The auxiliary rotor attachment structure(s), which is considered to include
gearboxes, must be designed to withstand design limit loads that occur in flight and on
landing. These design loads that generally consist of the following must be established
for the particular flight and landing condition under consideration.

                  (i)    Inertia loads generated by linear and angular accelerations of the
auxiliary rotors and their gearboxes, combined with-­

                   (ii)   Thrust and torque loads developed by the auxiliary rotors.

The linear and angular acceleration loads imposed by the weight of the tail rotor and
gearbox are generally derived from airframe loads data. Thrust and torque output of the
tail rotor are derived during external aerodynamic and landing loads development for
pertinent flight and landing conditions.

         (2) General rules related to proof of structure loads and factor of safety are
§§ 27.307, 27.301, 27.303, and 27.305.

     b. Procedures.

         (1) The angular and linear acceleration loads combined with appropriate tail
rotor thrust and torque for the critical conditions shall be imposed on the tail rotor
gearbox mount lugs, the airframe mounting structure, and the attaching hardware.

         (2) The yaw and maximum power climb conditions are generally critical.
Landing and maneuvering conditions with and without power may also impose high
inertia and rotor thrust and torque loads on the attachment structure.




Page C - 20

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →