EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-29

Large Rotorcraft

Amendment 12 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 402 · PDF page 402

determine which of these need to be addressed and which criteria should be met for each objective.

(i) Acquisition: the VHM system acquisition cycle enables data acquisition at an adequate frequency for all types of operations.

(ii) Data availability: sufficient data is available at each VHM data review interval to evaluate the condition of monitored components according to every indicator and to perform any additional analysis needed for fault isolation.

(iii) Data review: the VHM data review interval observed is in line with that defined in the ICA and downloads, when applicable, are successful and free from errors.

(iv) Fault detection performance: in case of damage or degradation associated with incipient failures on the monitored components, the VHM system can provide early indication.

(v) VHM system hardware reliability: the VHM system hardware and installation are reliable (including airborne and ground-based systems, as applicable).

(vi) Ground-based system software reliability: required for ground-based systems using COTS software platforms.

(vii) Maintenance and troubleshooting burden: the processing of alerts and any subsequent tasks do not generate an increased risk of errors.

(viii) VHM usability and maintainability: the VHM system is usable (including pilot

interface, if any, and ground segment man-machine interface) and maintainable (procedures for calibration, software update, troubleshooting, etc.).

(ix) Effectiveness and completeness of the ICA: the ICA address all indications provided by the VHM system, and the instructions are effective for their analysis and any required subsequent fault isolation.

(3) Examples of KPIs and recommended targets for each of the objectives listed in (2) above are provided in GM1 29.1465(g).

(4) The CSI plan should be presented to and accepted by the Agency as part of the compliance demonstration of the VHM system with CS 29.1465.

(5) The CSI should only be closed once its objectives have been fulfilled. For this purpose, the applicant should document how this is demonstrated, considering the evaluations of KPIs, the data gathered versus the targets selected, and feedback from the operators involved in the CSI plan. In addition, any other relevant event or finding should be duly recorded and investigated. Finally, the CSI closure process should be duly documented and:

(i) provided to the Agency for any of the CSI activities necessary in support of the demonstration of compliance of a VHM credit application. The Agency should concur with the fulfilment of the CSI objectives and, thus, the confirmation of the assumptions addressed by the CSI; or

(ii) agreed with the operator(s) involved, for any other CSI activities. The Agency should be informed and consulted in case of disagreement between the applicant and the operator(s).

(6) The CSI activities should typically be performed in close collaboration with a number of operators. In addition, operator feedback should be used in the evaluation of some CSI

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.