EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-29

Large Rotorcraft

Amendment 12 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-29 Amendment 12.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66

Source page 383 · PDF page 383

(f) Demonstration of performance

(1) Fault detection performance

The applicant should design the VHM system and define a monitoring approach that achieves adequate fault detection performance for each of the intended system applications.

The fault detection performance should be demonstrated for each VHM application by appropriate means, as defined in (2) below, addressing the following aspects:

(i) The progression of the degraded condition (failure progression) to be detected by the VHM system is well understood and justified to feature a detectable stage of damage or degradation that will systematically precede the failure.

(ii) This degraded condition will produce a mechanical response, whose signal(s) may be acquired and processed into indicators that are capable of highlighting an abnormal behaviour in case of damage or degradation by means of the proposed monitoring approach.

(iii) The VHM system will provide indications that are capable, in combination with the associated alert management procedures, of detecting and isolating the fault.

(iv) The computed indicators are reliable and representative of the condition of the elements monitored providing a high probability of distinguishing between ‘healthy’ and ‘degraded’ elements (i.e. likelihood of fault detection).

(v) The capability of the monitoring approach to, in addition, deliver a false alarm rate that does not impair or compromise the operability and maintainability of the rotorcraft (further guidance may be found in Table 2 in GM1 29.1465(g)).

(vi) The reliability of the end-to-end process.

(2) Performance demonstration process and means

The applicant should demonstrate how the monitoring approach provides acceptable performance for each of its intended applications. This section provides details regarding means and methodologies to be used to complete this demonstration prior to its approval by the Agency.

(i) Performance demonstration methodology

The applicant should define a demonstration methodology based on an adequate combination of performance evaluation means, which are described in (ii)(A) and (B) below. The performance demonstration methodology may identify data from the CSI in support of confirming the performance of the VHM system; this is described in more detail in paragraphs (g) and (h). This methodology should define the means proposed for the demonstration of performance and justify that it is adequate considering its intended applications.

Given the nature and configurations of parts and assemblies monitored by VHM and the complexity of the mechanical signals being monitored, it is typically not practical to fully verify the performance of the VHM system for all parts or assemblies and associated degraded conditions by means of representative tests or in-service data. As a result, the demonstration of the VHM system performance may rely on certain assumptions involving aspects such as the characteristics of the failure progression or the variability and/or scatter of the acquired signals. The applicant should ensure that these assumptions are conservative and well

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.