CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
The safety objectives specified in Figures 3 and 4 should be allocated to any loss of function and/or malfunction of the VHM system that may prevent detection of a potential incipient failure before it progresses to its ultimate failure consequences. This typically includes failures such as undetected loss of monitoring and/or undetected erroneous data, which may remain dormant for intervals that could preclude at least one opportunity of detection by VHM.
(5) Implementation of safety requirements
The safety objectives to be met by the VHM system should establish the confidence that development errors have been minimised with an appropriate level of rigour, and system failure rates have been reduced to acceptable levels in accordance with CS 29.1309. EUROCAE ED-79B / SAE ARP 4754B is recognised as providing additional guidelines for establishing both safety assessment and development assurance processes. Further guidance regarding expected validation and verification activities are provided in paragraphs (f), (g), (h) and (i).
(e) Monitoring approach
The monitoring approach of a VHM application includes all the elements of the VHM system that ensure that its objectives are fulfilled. It encompasses any element of the VHM system design, installation and documentation which are defined in support of achieving the demonstrated fault detection performance.
The signal processing techniques, condition indicators and alerting criteria represent key elements of the monitoring approach, whose suitability is to be substantiated as part of the fault detection performance demonstration. In addition, other relevant elements focus on ensuring that VHM data is acquired, and indications are provided at appropriate intervals, as well as on allowing for the management of these indications to determine the condition of the monitored components. These are also important to ensure that the targeted fault detection performance is achieved. To ensure that a robust monitoring approach is defined in support of consistently achieving the necessary performance, the following elements should be considered:
(1) Signal acquisition
The acquisition cycle should be designed in such a way that all selected components and their failures are adequately monitored at an appropriate frequency irrespective of any interruptions in the cycle due to the operational profile. For this purpose, the sensitivity, dynamic range and bandwidth needs of the signal acquisition of each monitored component should be taken into consideration. Furthermore, the applicant should minimise the impact on the indicator values from the operating conditions in which the vibration signals are acquired.
The acquisition cycle should be justified as appropriate for each of the intended VHM applications of the system. Based on the acquisition cycle and the requirements of the applications of the VHM system, the applicant should define a recommended and a minimum frequency of data collection.
Whenever possible, the applicant should target a VHM system design capable of producing complete and reliable diagnostics in every flight with a defined duration in stabilised conditions that allow for signal acquisition. As general good practice, at least one data set for all components should be obtained on each flight of greater than 30 minutes in stabilised conditions without the need for in-flight pilot action.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source