CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
3.2.3 Determining the level of scrutiny
(a) The depth and extent of the HFs investigation to be performed in order to demonstrate compliance with CS 29.1302 is driven by the level of scrutiny.
The level of scrutiny is determined by analysing the design items using the criteria described in the following subparagraph:
(1) Integration. The level of the systems’ integration refers to the extent to which there are interdependencies between the systems that affect the operation of the rotorcraft by the crew members. The applicant should describe the integration between systems because it may affect the means of compliance. Paragraph 4.6 also refers to integration. In the context of that paragraph, ‘integration’ defines how specific systems are integrated into the cockpit and how the level of integration may affect the means of compliance.
(2) Complexity. The level of complexity of the system design from the crew members’ perspective is an important factor that may also affect the means of compliance. Complexity has multiple dimensions, for instance:
— the number, the accessibility and the level of integration of information that the crew members have to use (the number of items of information on a display, the number of colours), alerts, or voice messages may be an indication of the complexity;
— the number, the location and the design of the cockpit controls associated with each system and the logic associated with each of the controls; and
— the number of steps required to perform a task, and the complexity of the workflows.
(3) Novelty. The novelty of a design item is an important factor that may also affect the means of compliance. The applicant should characterise the degree of novelty on the basis of the answers to the following questions:
(i) Are any new functions introduced into the cockpit design?
(ii) Does the design introduce a new intended function for an existing or a new design item?
(iii) Are any new technologies introduced that affect the way the crew members interact with the systems?
(iv) Are any new design items introduced at aircraft level that affect crew member tasks?
(v) Are any unusual procedures needed as a result of the introduction of a new design item?
(vi) Does the design introduce a new way for the crew members to interact with the system?
While answering the above questions, each negative response should be justified by the applicant identifying the reference product as well that has been considered. The reference product can be an avionics suite or an entire flight deck previously certified by the same applicant.
The degree of novelty should be proportionate to the number of positive answers to the above questions.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source