CS-29
Large Rotorcraft
Amendment 12 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-29 Amendment 12.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for large rotorcraft, including the Amendment 12 vibration health monitoring provisions.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 37c3d4af295ea3ec222370e326c63753dabcbf00735cf671f3ad86e9d46cba66
If the above-mentioned testing is done without the engine, it should be first demonstrated that the engine flow is correctly simulated, and the engine thermal impact adequately considered and validated on air intake. In a second step, the repercussion of any ice accretion should be assessed at engine level both in terms of airflow distortion and engine ingestion and duly validated by appropriate means. It has to be noted that this alternative approach without the engine may lead to difficulties in interpreting the results at engine level.
During these tests, the engine should be run at critical power in the icing conditions defined in CS-29 Appendix C depending on the claimed certification (inadvertent icing encounter or full icing certification). The critical power could be determined following a critical point analysis (other methodologies might be acceptable) to assess the engine operability with regard to the feared events such as airflow distortion or engine ice ingestion.
To determine the temperature at which the water does not freeze on the external screen, the test temperature may be decreased by accurate steps (typically a value of 0.5°C is suggested) from 0°C until accretion downstream the external air intake screen, if any, is maximised. If no ice is observed after 15 minutes of water injection, the test point is believed to be performed at a too warm temperature and can be stopped.
When decreasing the temperature step by step, if no ice accretion is observed downstream the helicopter external screen — typically for temperatures below -5°C the external screen catches the majority of the super-cooled droplets — it means that the above-described phenomenon does not occur.
Some other method can be proposed to reduce the test point number.
The test should demonstrate that, at the determined critical temperature, the maximum potential ice accretions downstream the rotorcraft screen do not have an adverse effect on the engine both in the full range of claimed operation and when the rotorcraft then descends in an atmosphere with a positive OAT.
As an example, the following test procedure may be considered:
— A 1st run: at the end of the test (in fact, when reaching the highest measured pressure drop in the air intake), perform three consecutive engine quick decelerations (from maximum power to idle) / accelerations (from idle to maximum power).
— A 2nd run: at the end of the test (in fact, when reaching the highest measured pressure drop in the air intake), simulate a quick descent in atmosphere with a positive OAT considering a tunnel warm-up procedure.
Quick accelerations / decelerations are to be understood as the maximum acceleration / deceleration rates that can be performed by a pilot during flight operation. The intent is to simulate a real-life engine behaviour which affects the flow/ice ingestion accordingly. For example, values close to one second from minimum to maximum power have been considered in the past for such testing.
As specified in CS 29.1093(b)(1)(i), these tests shall demonstrate that the engine operation is not adversely affected by icing conditions.
Whenever an applicant is willing to use previous icing wind tunnel tests, an analysis might be an acceptable means of compliance provided that this analysis is adequately validated and covers as a minimum the changes in configurations (air intakes, engines, engine installations, etc.), engine operability (airflow, ingestion capabilities, surge margins, etc.) and thermal environment of the air intake.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source