FAA Advisory circularActive — selected source checked

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

27-1B · Changes 1–9 incorporated Source checked 2026-11-28

Scope, source and reading notes

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

Source page 1038 · PDF page 1038

(v) If a failure occurs, it will not prevent the pilot from safely operating the rotorcraft.

(2) The manufacturers should provide design rationale for their decisions regarding new or unique features in a display. Evaluation pilots should verify that the data support a conclusion that any new or unique features have no unsafe or misleading design characteristics.

(3) Several pilots as well as human factors representatives should conduct display and system interface evaluations particularly when the applicant is installing a system for the first time in a particular category of helicopter. More than one test pilot should be used to ensure multiple data inputs. For systems that contain new or unique features, consider a greater number of evaluators. A reasonable amount of training time should be allowed to learn all required features of the display system. The evaluators should be familiar with the guidance contained in this advisory circular before performing the evaluation. Additional information helpful in developing evaluation plans. For instance, example information regarding evaluation plan development can be found in GAMA Publication No. 10, Recommended Practices and Guidelines for Part 23 Cockpit/Flight Deck Design; DOT/FAA/AM-01/17, Human Factors Design Guidelines for Multifunction Displays; and section AC 27 MG 19 of this AC.

f. Methods of Compliance. The parts of the certification plan that address the HF portions of the regulations should describe the methods used to demonstrate compliance with sufficient detail to allow the certification authority to evaluate the appropriateness and adequacy of the proposed methods of compliance. It is important that the proposed methods of HF compliance are coordinated and discussed with the certification authority to identify HF issues early in the program to avoid certification schedule delays. Paragraph h. of this MG below, contains a sample compliance matrix for HF.

g. Discussion of selected part 27 regulations related to human factors and performance.

(1) For the purposes of brevity, the regulations discussed are not restated. For all compliance- related documents, the certification plan should use the exact wording of the regulation.

(i) This part of the guidance does not include all regulations associated with HF and flightcrew interfaces listed in the table in paragraph b. above. In addition, several of the regulations are written in general terms. In these cases, subjective data are often used to establish compliance

(ii) Due to the subjective nature of many of the HF aspects of the regulations, the certification authorities encourage applicants to carefully consider and thoroughly describe the means they intend to use to demonstrate compliance with each regulation. The applicant may choose to provide the detailed description of the means of compliance in subsequent submitted test plans. Use the information contained in the discussion for each regulation, presented paragraph g.(2), to assess the appropriateness and adequacy of the chosen methods. The certification authority and the applicant should meet to discuss and reach agreement as to the acceptability of the proposed techniques prior to the collection of compliance demonstration data. Demonstrate compliance through similarity and minimal testing for simple and straightforward applications that have little impact on pilot workload, system awareness, tasking, or performance. It should be understood that the regulations discussed in paragraph g.(2) are not a comprehensive list.

(iii) More complex, integrated designs may require pilot evaluation under actual anticipated flight conditions after the performance of analytical and component-level bench evaluations. For these tests, it is critical the flight test pilots are objective regarding their performance using systems and controls. If using pilots other than test pilots, observers should be alert to possible differences between how the pilot performs and interfaces with a system and the pilot’s ratings. The test program should include sufficient simulation and flight testing to ensure:

(A) Reasonable training times and learning curves.

(B) Acceptable interpretation and operation error rates equivalent to or less than previously certificated comparable systems.

View figures, tables and original page layoutOriginal source page Source page 1038 · PDF page 1038 of AC 27-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-27

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.