FAA Advisory circularActive — selected source checked

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

27-1B · Changes 1–9 incorporated Source checked 2026-11-28

Scope, source and reading notes

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

Source page 1037 · PDF page 1037

(ii) Identify the operations the system is designed to support. Although sometimes considered less complex than installations for operation under IFR, the HF evaluation of installations for operation under VFR should include the same rigor, as both present HF challenges to the pilot. For example, complex systems or systems that require the pilot to spend considerable time interfacing with a system’s functions and interactions with other rotorcraft systems will require the pilot to allocate attention from flying the rotorcraft. The results are increased workload with varying changes in the pilot’s ability to attend to flying the rotorcraft. The following are some considerations:

(A) For rotorcraft operating only under VFR, describe the operations the system is meant to support, taking into account day and night operations. For example, for installation of an electronic display systems (EDS) display suite that integrates with external GPS navigators, consider:

(1) The effect of the pilot-system interface on the pilot’s attention allocation and workload.

(2) How it affects the pilot’s external scan and “see and avoid” tasks (whether it requires extensive heads-down time).

(B) For rotorcraft certificated to operate under IFR, describe the operations the system supports. For example, for installation of a new EDS suite and a WAAS GPS system that interfaces with the existing autopilot and one of the new operations is steep angle low speed approaches, consider how the system will support or change pilot workload.

(iii) System Operation procedures. Describe and evaluate the pilot procedures for both normal and abnormal conditions since the design of the system and use of procedures are interrelated. Additionally, development and presentation of procedures and limitations can affect pilot workload, particularly in abnormal conditions. Identify and evaluate any expected pilot memory or “bold-face” items (procedures that the pilot must perform from memory prior to referencing a checklist or flight manual). In addition to the flight manual or flight manual supplement, system operations procedures may include:

(A) Quick reference handbook to accompany the flight manual.

(B) Abbreviated checklists to accompany the flight manual.

e. Certification Requirements. Identify the regulations in the certification basis for system or component installations that have HF implications. These can be identified either as part of the certification plan or a separate human factors certification plan. The certification plan should indicate the method of compliance for each regulation and contain sufficient detail to ensure human factors considerations are adequately addressed. The plan should also allow adequate time to accomplish all necessary testing agreed to by the applicant and the FAA.

(1) Address and evaluate the following in the certification plan:

(i) The intended use of the system does not require any exceptional skill or generate any unreasonable workload for the pilot.

(ii) The use of the display does not require unreasonable training requirements to demonstrate adequately that the pilot can understand and properly operate the system in all operational environments.

(iii) Demonstration of the design characteristics of the display system support error avoidance and management (e.g., detection, recovery, etc.).

(iv) The display system integration is consistent or compatible with other cockpit controls and creates no added burden on the pilot with respect to the new display system or operation of other systems.

View figures, tables and original page layoutOriginal source page Source page 1037 · PDF page 1037 of AC 27-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-27

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.