FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 957

PDF page 957 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 957
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

2/12/03                                       AC 27-1B, Chg 1


      HUMS GROUND APPLICATION FOR SOFTWARE WITH COTS


  Criticality Category
  Determination through a
  Functional Hazard
  Assessment (FHA)



    1309 Integrity
    Requirements
     Software – DO178B
     Level Determination





                                                                    Independent
                                                                              Verification Means
      Final HUMS Ground              Ground COTS        DO178B Software Level
                                             Software                  for HUMS Application     Application DO178B                                                                                               (If applicable)

                    Ground COTS Hardware


                                                                       Independent
                           COMPARE           Verification Means
                                              HUMS Results     HUMS Results Data Out-Put                                                                   Data Out-Put



  FIGURE AC 27 MG 15-2: Flow chart for application of HUMS specific software
      with a ground base that uses COTS software for operational software.


               (1) COTS. This type of software can only be accepted by subjective
considerations, such as service history, independent verification means, and design of
the system to limit access to the operational COTS software to make changes. The
independent means of verification activity is required due to the use of COTS software.

               (2) HUMS Specific Software. This software should be developed to the
integrity level required by the system criticality assessment using RTCA/DO-178 as the


                                                      Page MG 15 - 11

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →