Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
2/12/03 AC 27-1B, Chg 1
(iii) Performance. There must be minimum end-to-end performance
criteria consistent with the application's intended use. Performance criteria, as a
minimum, should consider accuracy, timing/sampling, resolution, event recognition, and
consistency. The HUMS signal source must be compatible with the determined
qualification level. Tests should be conducted to demonstrate that these criteria are
met.
(2) Airborne Equipment Installation. Airborne equipment and the associated
installation qualification procedures are the same as for any other airborne equipment.
The installation qualification and the equipment qualification may be considered two
separate activities although there is an obvious relationship between them. Signal
independence, irrespective of method of implementation, should exist to the extent that
acquisition of HUMS signals should not compromise the level of safety or reliability of
functions provided by other equipment as a result of signal sharing.
(i) Equipment Installation. Equipment not approved by other methods
must be approved as part of the installation and must consider overall system
requirements.
(A) Equipment Qualified as Part of Installation. Equipment qualified all or
in part as a part of the installation includes minor and major parts. Examples of minor
parts are: connectors, common usage relays, diodes, etc. Examples of major parts are
non-prequalified equipment (equipment not TSO’d or not qualified under the TSO to the
required level for installation approval), consisting of significant system components and
as transducers with their interfaces. Equipment qualification must consider
environmental qualification (RTCA/DO-160/ED 14) including high intensity radiated
fields (HIRF) and lightning.
(B) Software. RTCA/DO-178/ED-12 should be used for the software
development standard. (See following figure for typical airborne application process for
software not containing COTS.)
Page MG 15 - 7
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.