Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
9/30/99 AC 27-1B
CHAPTER 3
AIRWORTHINESS STANDARDS
NORMAL CATEGORY ROTORCRAFT
MISCELLANEOUS GUIDANCE (MG)
AC 27 MG 9 ROTORCRAFT ONE-ENGINE-INOPERATIVE POWER ASSURANCE
a. Purpose. The purpose of this document is to establish an approach for an
engine power assurance procedure which will assure that the required OEI power level
can be achieved.
b. General. The data and methods described herein are intended to be utilized as
a guide and not necessarily the only means of achieving the desired result.
c. Applicability. The applicability of the document is intended to be primarily in
support of the new 30-second and 2-minute OEI rotorcraft engine rating scheme.
d. Partial Power Assurance (Engine “Run-Line”).
(1) Fundamental to the concept of limited-use one-engine inoperative (OEI)
ratings is the requirement to be certain that the rated OEI power will indeed be available
when needed. Conventional periodic power-assurance and topping checks are
impractical with the limited-use rating concept because of the rapid expenditure of
useful life during exposure at the engine speeds and temperatures consistent with
limited-use ratings; therefore, we require a means of assuring the power available, other
than by actual demonstration on each service engine. The advent of more
sophisticated controls and engine developments catering to the 30-second/2-minute
OEI rating concepts can provide the means to determine: (1) that the
thermodynamic/mechanical capability of the engine as tested at the prevailing ambient
conditions, will permit reaching a specified power level at any other ambient condition
and (2) the fuel system and the various limiters will not prevent the engine achieving
OEI power on demand. Pending availability of these new methods, the “parallel run line
check” approach is recommended.
(2) The method commonly called the “parallel run-line check” that has been in
use for two decades may require refinement for application to the new rating structure
where the degree of extrapolation to the OEI power level is more extensive and the
slope of the individual engine characteristic is important. As in any power assurance
method, success is strongly dependent on the validity of the data base, the
maintenance of the engines and sensor/indicating systems, and the care taken during
the conduct of the power check. In addition, trending of individual engine performance
by the operator and associated analyses can be used to avoid unnecessary flight delays
and engine removals.
Page MG 9 - 1
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.