Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
4/25/06 AC 27-1B, Chg 2
(C) Installation Test Conditions: “Equipment Known to Have a High
Potential for Interference” represents the main concern for radiated and conductive
interference; therefore, ground and flight tests are usually required. Therefore, when
the EMI installation tests described in paragraph (2)(iii) are required, ground and flight
tests will usually need to be conducted. Ground tests alone are usually not sufficient
since some equipment may pose safety issues if operated on the ground, while other
equipment cannot be satisfactorily operated on the ground, or the equipment would
provide misleading results if operated on the ground. For example, some equipment is
prohibited from being operated on the ground, such as hoists.
(D) If the proposed installed equipment has been tested in relation to the
critical electronic control system on another identical installation, then there can be an
exception to the EMI installation testing requirements defined in paragraph (2)(iii). The
data showing identicality of the equipment and installation with passing test data are
acceptable in place of further testing on the same type rotorcraft.
(3) Summary. The concern for potential interference to electronic controls that
provide critical functions may be addressed by the methods contained within this
document. To address the interference aspects of “equipment known to have a high
potential for interference,” the equipment must be tested as a part of the installation as
described in paragraph (2)(iii), during ground and flight tests.
Page MG 4 - 13
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.